Segui
Jacques Erschler
Jacques Erschler
Université de Toulouse, INSA, LAAS
Email verificata su univ-toulouse.fr
Titolo
Citata da
Citata da
Anno
Finding some essential characteristics of the feasible solutions for a scheduling problem
J Erschler, F Roubellat, JP Vernhes
Operations Research 24 (4), 774-783, 1976
1161976
A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates
J Erschler, G Fontan, C Mercé, F Roubellat
Operations Research 31 (1), 114-127, 1983
991983
Consistency of the disaggregation process in hierarchical planning
J Erschler, G Fontan, C Mercé
Operations Research 34 (3), 464-469, 1986
931986
Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement
J Erschler, P Lopez, C Thuriot
Revue d'intelligence artificielle 5 (3), 7-32, 1991
911991
Decision-aid in job shop scheduling: A knowledge based approach
J Erschler, P Esquirol
Proceedings. 1986 IEEE International Conference on Robotics and Automation 3 …, 1986
871986
Ordonnancement de tâches sous contraintes: une approche énergétique
P Lopez, J Erschler, P Esquirol
Automatique-productique informatique industrielle 26 (5-6), 453-481, 1992
801992
Periodic loading of flexible manufacturing systems
J ERSCHELER
Proc. of the IFIP Congress, APMS, Bordeaux, France, 327-339, 1982
741982
Analyse sous contraintes et aide à la décision pour certains problèmes d'ordonnancement
J Erschler
Université de Toulouse, 1976
711976
Les problèmes d'ordonnancement
J Carlier, P Chrétienne, J Erschler, C Hanen, P Lopez, A Munier, E Pinson, ...
RAIRO-Operations Research 27 (1), 77-150, 1993
601993
Automation of a hydroelectric power station using variable-structure control systems
J Erschler, F Roubellat, JP Vernhes
Automatica 10 (1), 31-36, 1974
541974
Characterizing the set of feasible sequences for n jobs to be carried out on a single machine
J Erschler, F Roubellat, JP Vernhes
European Journal of Operational Research 4 (3), 189-194, 1980
511980
A knowledge-based approach to industrial job-shop scheduling
G Bel, E Bensana, D Dubois, J Erschler, P Esquirol
Knowledge-based systems in manufacturing, 207--246, 1989
491989
Energy-based approach for task scheduling under time and resources constraints
J Erschler, P Lopez
2nd international workshop on project management and scheduling, 115-121, 1990
431990
A robust approach for the single machine scheduling problem
C Briand, HT La, J Erschler
Journal of Scheduling 10, 209-221, 2007
412007
Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints
J Erschler, F Roubellat, C Thuriot
Annals of Operations Research 3, 333-353, 1985
381985
AN APPROACH FOR REAL TIME SCHEDULING OF ACTIVITIES WITH TIME AND RESOURCE CONSTRAINTS
J Erschler, F Roubellat
Advances in project scheduling, 237-272, 1989
291989
A new sufficient condition of optimality for the two-machine flowshop problem
C Briand, HT La, J Erschler
European Journal of Operational Research 169 (3), 712-722, 2006
252006
Negotiation based on constraints in cooperation
MJ Huguet, J Erschler, G De Terssac, N Lompré
Computer Supported Cooperative Work (CSCW) 5, 267-284, 1996
241996
A decision-making process for the real time control of a production unit
J Erschler, F Roubellat, JP Vernhes
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 14 (2), 275-284, 1976
231976
Approche par contraintes pour l’aide aux décisions d’ordonnancement
J Erschler, C Thuriot
Les nouvelles rationalisations de la production, 249-266, 1992
221992
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20