Pierre Lopez
Pierre Lopez
Directeur de Recherche CNRS, LAAS, Université de Toulouse
Email verificata su laas.fr - Home page
TitoloCitata daAnno
Anaerobic membrane bioreactors for wastewater treatment: a review
G Skouteris, D Hermosilla, P López, C Negro, Á Blanco
Chemical Engineering Journal 198, 138-148, 2012
2422012
Event-based MILP models for resource-constrained project scheduling problems
O Koné, C Artigues, P Lopez, M Mongeau
Computers & Operations Research 38 (1), 3-13, 2011
2002011
L'ordonnancement
P Esquirol, P Lopez, P Lopez
Economica, 1999
1051999
Disfunción familiar y control del paciente diabético tipo 2
D María, M López, V Manuel, G López, M Elena, G Ruiz, P López
Rev Med IMSS 42 (4), 281-284, 2004
1012004
Ordonnancement de la production
P Lopez, F Roubellat
Hermès science publications, 2001
972001
Discrepancy search for the flexible job shop scheduling problem
AB Hmida, M Haouari, MJ Huguet, P Lopez
Computers & Operations Research 37 (12), 2192-2201, 2010
942010
The energy scheduling problem: Industrial case-study and constraint propagation techniques
C Artigues, P Lopez, A Hait
International Journal of Production Economics 143 (1), 13-23, 2013
852013
Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement
J Erschler, P Lopez, C Thuriot
Revue d'intelligence artificielle 5 (3), 7-32, 1991
831991
Ordonnancement de tâches sous contraintes: une approche énergétique
P Lopez, J Erschler, P Esquirol
Automatique-productique informatique industrielle 26 (5-6), 453-481, 1992
801992
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
C Artigues, P Lopez, PD Ayache
Annals of Operations Research 138 (1), 21-52, 2005
762005
A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite
P Tangpattanakul, N Jozefowiez, P Lopez
European Journal of Operational Research 245 (2), 542-554, 2015
742015
Production scheduling
FO Roubellat
ISTE, 2008
672008
On not-first/not-last conditions in disjunctive scheduling
P Torres, P Lopez
European Journal of Operational Research 127 (2), 332-343, 2000
652000
Parallel machine scheduling with precedence constraints and setup times
B Gacias, C Artigues, P Lopez
Computers & Operations Research 37 (12), 2141-2151, 2010
642010
Les problèmes d'ordonnancement
J Carlier, P Chrétienne, P VILLON, J Erschler, C Hanen
RAIRO. Recherche opérationnelle 27 (1), 77-150, 1993
601993
Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources
O Koné, C Artigues, P Lopez, M Mongeau
Flexible Services and Manufacturing Journal 25 (1-2), 25-47, 2013
562013
Consistency enforcing in scheduling: A general formulation based on energetic reasoning
P Lopez, P Esquirol
421996
Energy-based approach for task scheduling under time and resources constraints
J Erschler, P Lopez
2nd international workshop on project management and scheduling, 115-121, 1990
371990
Mixed-integer linear programming formulations
C Artigues, O Koné, P Lopez, M Mongeau
Handbook on Project Management and Scheduling Vol. 1, 17-41, 2015
352015
Generalized disjunctive constraint propagation for solving the job shop problem with time lags
C Artigues, MJ Huguet, P Lopez
Engineering Applications of Artificial Intelligence 24 (2), 220-231, 2011
352011
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20