Segui
Deniz Türsel Eliiyi
Titolo
Citata da
Citata da
Anno
The state of the art on buffer allocation problem: a comprehensive survey
L Demir, S Tunali, DT Eliiyi
Journal of Intelligent Manufacturing 25 (3), 371–392, 2014
1812014
A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
D Kizilay, DT Eliiyi
Flexible Services and Manufacturing Journal 33 (1), 1-42, 2021
722021
An adaptive tabu search approach for buffer allocation problem in unreliable non-homogenous production lines
L Demir, S Tunalı, DT Eliiyi
Computers & Operations Research 39 (7), 1477-1486, 2012
662012
Metaheuristic algorithms for the hybrid flowshop scheduling problem
H Öztop, MF Tasgetiren, DT Eliiyi, QK Pan
Computers & Operations Research 111, 177-196, 2019
652019
An energy-efficient permutation flowshop scheduling problem
H Öztop, MF Tasgetiren, DT Eliiyi, QK Pan, L Kandiller
Expert systems with applications 150, 113279, 2020
522020
Trip allocation and stacking policies at a container terminal
C Güven, DT Eliiyi
Transportation Research Procedia 3, 565-573, 2014
502014
Constraint programming models for integrated container terminal operations
D Kizilay, P Van Hentenryck, DT Eliiyi
European Journal of Operational Research 286 (3), 945-962, 2020
412020
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
352009
Island-based crow search algorithm for solving optimal control problems
MS Turgut, OE Turgut, DT Eliiyi
Applied Soft Computing 90, 106170, 2020
302020
Applications of Bin Packing Models Through The Supply Chain
U Eliiyi, DT Eliiyi
International Journal of Business and Management Studies 1 (1), 11-19, 2009
302009
Modelling and optimisation of online container stacking with operational constraints
C Güven, D Türsel Eliiyi
Maritime Policy & Management 46 (2), 201-216, 2019
292019
A multiscale algorithm for joint forecasting–scheduling to solve the massive access problem of IoT
V Rodoplu, M Nakıp, DT Eliiyi, C Güzeliş
IEEE Internet of Things Journal 7 (9), 8572-8589, 2020
282020
Ensemble of metaheuristics for energy-efficient hybrid flowshops: Makespan versus total energy consumption
H Öztop, MF Tasgetiren, L Kandiller, DT Eliiyi, L Gao
Swarm and Evolutionary Computation 54, 100660, 2020
252020
Two approaches for solving the buffer allocation problem in unreliable production lines
L Demir, S Tunalı, DT Eliiyi, A Lĝkketangen
Computers & Operations Research 40 (10), 2556-2563, 2013
252013
Constraint and mathematical programming models for integrated port container terminal operations
D Kizilay, DT Eliiyi, P Van Hentenryck
Integration of Constraint Programming, Artificial Intelligence, and …, 2018
242018
Cargo allocation and vessel scheduling on liner shipping with synchronization of transshipments
S Ozcan, DT Eliiyi, LB Reinhardt
Applied Mathematical Modelling 77, 235-252, 2020
212020
Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industry
SY Köse, L Demir, S Tunalı, DT Eliiyi
Engineering Optimization 47 (2), 149-164, 2015
212015
Spread time considerations in operational fixed job scheduling
DT Eliiyi, M Azizoglu
International Journal of Production Research 44 (20), 4343-4365, 2006
202006
Joint forecasting-scheduling for the Internet of Things
M Nakip, V Rodoplu, C Güzeliş, DT Eliiyi
2019 ieee global conference on internet of things (gciot), 1-7, 2019
192019
A fixed job scheduling problem with machine-dependent job weights
DT Eliiyi, M Azizoğlu
International Journal of Production Research 47 (9), 2231-2256, 2009
192009
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20