Follow
AMROUCHE KARIM
AMROUCHE KARIM
Professor, RECITS Labroratory, University of Algiers 3
Verified email at usthb.dz - Homepage
Title
Cited by
Cited by
Year
the chain-reentrant shop with an exact time lag : new results
karim Amrouche, M Boudhar, M Bendraouche, F Yalaoui
International journal of production research, DOI : 10.1080/00207543.2016 …, 2016
192016
Two machines flow shop with reentrance and exact time lag
KAM Boudhar
RAIRO, operation research 50 (2), 223 - 232, 2016
18*2016
Two-machine chain-reentrant flow shop with the no-wait constraint
K Amrouche, MBN Sami
European Journal of Industrial Engineering 14 (4), 573-597, 2020
52020
Résolution d’un problème d’ordonnancement de type flowshop reentrant sans-attente
K Amrouche, M Boudhar, M Bendraouche, F Yalaoui
Roadef 2017, 2017
12017
Ordonnancement sur une ligne de production avec recirculation
K Amrouche
Faculté des Mathématiques, 2016
12016
The chain-reentrant shop with the no-wait constraint
K Amrouche, M Boudhar, F Yalaoui
IFAC-PapersOnLine 49 (12), 414-418, 2016
12016
A Multi start descent heuristic for a chain-reentrant shop
FY Karim Amrouche, Mourad Boudhar
Metaheuristic International conference, 2015
1*2015
Flow shop à deux machines avec recirculation
K Amrouche
Alger, 2010
12010
Reentrant open shop scheduling problem with time lags and no-wait constraints
K Alioui, K Amrouche, M Boudhar
Computers & Operations Research, 106595, 2024
2024
Problème d’ordonnancement d’atelier de type chain-reentrant shop hybride avec tâches détériorables.
K Amrouche, MBN Mohamed
DIMACOS 2019, Conference on Discrete Mathematics and Computer Science, 50-53, 2019
2019
2machine chain-reentrant shop with no-wait constraint
N SAMI, K AMROUCHE, M BOUDHAR
9 ème édition du colloque Tendances dans les Applications Mathématiques en …, 2019
2019
The two machines chain-reentrant shop with no-wait constraint :new results
K Amrouche, N Sami, M Boudhar, M Bendraouche
Tunisian Operational Research Society, 2018
2018
Complexity results of a chain chain reentrante shop with an exact time lag
K Amrouche, M Boudhar, F Yalaoui
ORPA'2015: Operational Research Practice in Africa Conference 2015, 2015
2015
Complexity results of a chain reentrante shop with an exact time lag
FY Karim Amrouche, Mourad Boudhar
Operation research practice in Africa, 2015
2015
A metaheuristic for a chain reentrant shop with an exact time lag
KAM Boudhar
Conféerence Internationale sur la Conception et Production intégrées, 2013
2013
A genetic algorithm for a chain-reentrant shops with an exact time lag
MB Karim Amrouche
26th European Conference on Operational Research (EURO/INFORMS MMXIII),, 2013
2013
JOURNÉES SCIENTIFIQUES DU LABORATOIRE RECITS (JSL’2016)
H Boumediene
The system can't perform the operation now. Try again later.
Articles 1–17