Follow
Satie Ledoux Takeda-Berger
Satie Ledoux Takeda-Berger
Ph.D. in Production Engineering from Federal University of Santa Catarina, Brazil
Verified email at posgrad.ufsc.br
Title
Cited by
Cited by
Year
Lean Supply Chain Management: A Systematic Literature Review of Practices, Barriers and Contextual Factors Inherent to Its Implementation
SL Takeda-Berger, GL Tortorella, CMT Rodriguez
Progress in Lean Manufacturing, 39-68, 2018
382018
Simulation-based analysis of inventory strategies in lean supply chains
SL Takeda-Berger, GL Tortorella, EM Frazzon
IFAC-PapersOnLine 51 (11), 1453-1458, 2018
292018
Towards a data-driven predictive-reactive production scheduling approach based on inventory availability
SL Takeda-Berger, RM Zanella, EM Frazzon
IFAC-PapersOnLine 52 (13), 1343-1348, 2019
202019
Analysis of the relationship between barriers and practices in the lean supply chain management
SL Takeda-Berger, GL Tortorella, CMT Rodriguez, EM Frazzon, ...
International Journal of Lean Six Sigma 12 (3), 607-626, 2021
122021
Machine Learning in Production Scheduling: An Overview of the Academic Literature
SL Takeda-Berger, EM Frazzon, E Broda, M Freitag
International Conference on Dynamics in Logistics, 409-419, 2020
112020
Pull-production system in a lean supply chain: a performance analysis utilizing the simulation-based optimization
SL Takeda-Berger, EM Frazzon, AMC Danielli
2018 13th IEEE International Conference on Industry Applications (INDUSCON …, 2018
102018
Análise de planejamento e controle da produção baseada na simulação de um processo produtivo utilizando um modelo híbrido de MRP e Kanban
J Bianchini, GH Darú, SL Takeda-Berger
Journal of Lean Systems 3 (1), 66-86, 2017
52017
Examining Practices, Barriers, and Contextual Issues in the Literature of Lean Supply Chain Management
SL Takeda-Berger, GL Tortorella, CMT Rodriguez, PA Cauchick-Miguel
Journal of Management & Engineering Integration 11 (1), 28-39, 2018
42018
Proposta de aplicação de previsão de vendas de séries temporais para uma indústria metal-mecânica
TT Yokoyama, SL Takeda
Revista Eletrônica de Tecnologia e Cultura 14 (14), 141-152, 2014
42014
An inventory data-driven model for predictive-reactive production scheduling
SL Takeda-Berger, EM Frazzon
International Journal of Production Research, 1-25, 2023
32023
Bayesian networks as a guide to value stream mapping for lean office implementation: a proposed framework
TT Yokoyama, SL Takeda-Berger, MA de Oliveira, AH Futami, ...
Operations Management Research, 2022
2*2022
Reactive production scheduling approach based on inventory availability
SL Takeda-Berger, ÍRS Agostino, MRF da Silva, EM Frazzon
IFAC-PapersOnLine 55 (10), 418-423, 2022
22022
Lean Supply Chain strategies based on the pull-production system: a simulation-based analysis
SL Takeda-Berger, GL Tortorella, ÍRS Agostino, EM Frazzon, ...
4th European Rome Conference 2021 – IEOM (International Conference on …, 2021
22021
An overview of Lean Supply Chain Management: concepts, principles and impacts
SL Takeda-Berger, TT Yokoyama, CMT Rodriguez
Journal of Lean Systems 3 (2), 90-103, 2018
22018
Analysis of production planning and control based on the simulation of a production process using a hybrid MRP and Kanban model
J Bianchini, GH Darú, SL Takeda-Berger
Journal of Lean Systems 3 (1), 66-86, 2018
22018
Digital and smart production planning and control
IR Uhlmann, SLT Berger, CA de Souza Silva, EM Frazzon
Designing Smart Manufacturing Systems, 311-343, 2023
12023
Lean supply chain management: uma revisão sistemática da literatura das principais práticas, barreiras e fatores contextuais inerentes à sua implementação
SLT Berger, GL Tortorella
Produto & Produção 19 (1), 2018
12018
A Combined Approach for Predicting Operational Performance in Port Terminals
ÍRS Agostino, SL Takeda-Berger, EM Frazzon, AM Souza
4th European Rome Conference 2021 – IEOM (International Conference on …, 2021
2021
Avaliação do nível de maturidade do processo de desenvolvimento de produtos de indústria eletroeletrônica
TT Yokoyama, SL Takeda-Berger, MA de Oliveira, EM Frazzon, ...
Gepros: Gestão da Produção, Operações e Sistemas 14 (5), 133, 2019
2019
Lean Supply Chain: Where are we, where are we going?
DL Oliveira, SL Takeda-Berger, EM Frazzon, JB Silva
VIII Congresso de Sistemas Lean 1, 927-941, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20