Follow
Andy Ham; Myoungsoo Ham; A. Ham; A. M. Ham
Andy Ham; Myoungsoo Ham; A. Ham; A. M. Ham
Verified email at ncat.edu
Title
Cited by
Cited by
Year
Integrated scheduling of m-truck, m-drone, and m-depot constrained by time-window, drop-pickup, and m-visit using constraint programming
AM Ham
Transportation Research Part C: Emerging Technologies 91, 1-14, 2018
2942018
Flexible job shop scheduling problem with parallel batch processing machines: MIP and CP approaches
AM Ham, E Cakici
Computers & Industrial Engineering 102, 160-165, 2016
702016
Transfer-robot task scheduling in job shop
A Ham
International Journal of Production Research, 1-11, 2020
532020
Flexible job shop scheduling problem for parallel batch processing machine with compatible job families
A Ham
Applied Mathematical Modelling 45, 551-562, 2017
442017
An effective problem decomposition method for scheduling of diffusion processes based on mixed integer linear programming
C Jung, D Pabst, M Ham, M Stehli, M Rothe
IEEE Transactions on Semiconductor Manufacturing 27 (3), 357-363, 2014
442014
Transfer-robot task scheduling in flexible job shop
A Ham
Journal of Intelligent Manufacturing 31, 1783–1793, 2020
372020
Real-time scheduling of multi-stage flexible job shop floor
M Ham, YH Lee, SH Kim
International Journal of Production Research 49 (12), 3715-3730, 2011
342011
Constraint programming approach for scheduling jobs with release times, non-identical sizes, and incompatible families on parallel batching machines
A Ham, JW Fowler, E Cakici
IEEE Transactions on Semiconductor Manufacturing 30 (4), 500-507, 2017
332017
Scheduling of dual resource constrained lithography production: Using CP and MIP/CP
A Ham
IEEE Transactions on Semiconductor Manufacturing 31 (1), 52-61, 2017
302017
Energy-aware flexible job shop scheduling under time-of-use pricing
MJ Park, A Ham
International Journal of Production Economics 248, 108507, 2022
272022
Drone-based material transfer system in a robotic mobile fulfillment center
A Ham
IEEE Transactions on Automation Science and Engineering 17 (2), 957-965, 2019
272019
A practical two-phase approach to scheduling of photolithography production
AM Ham, M Cho
IEEE Transactions on Semiconductor Manufacturing 28 (3), 367-373, 2015
252015
Scheduling of wet etch and furnace operations with next arrival control heuristic
M Ham, JW Fowler
The International Journal of Advanced Manufacturing Technology 38 (9), 1006-1017, 2008
242008
Human–robot task allocation and scheduling: Boeing 777 case study
A Ham, MJ Park
IEEE Robotics and Automation Letters 6 (2), 1256-1263, 2021
222021
Energy-aware flexible job shop scheduling using mixed integer programming and constraint programming
A Ham, MJ Park, KM Kim
Mathematical Problems in Engineering 2021, 1-12, 2021
172021
Electric vehicle route optimization under time-of-use electricity pricing
A Ham, MJ Park
Ieee Access 9, 37220-37228, 2021
152021
Integer programming-based real-time dispatching (i-RTD) heuristic for wet-etch station at wafer fabrication
M Ham
International journal of production research 50 (10), 2809-2822, 2012
132012
IP-based real-time dispatching for two-machine batching problem with time window constraints
M Ham, YH Lee, J An
IEEE transactions on automation science and engineering 8 (3), 589-597, 2011
132011
Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility
YH Lee, M Ham, B Yoo, JS Lee
The International Journal of Advanced Manufacturing Technology 41, 568-579, 2009
132009
Dynamic wet-furnace dispatching/scheduling in wafer fab
M Ham, M Raiford, F Dillard, W Risner, M Knisely, J Harrington, T Murtha, ...
The 17th Annual SEMI/IEEE ASMC 2006 Conference, 144-147, 2006
132006
The system can't perform the operation now. Try again later.
Articles 1–20