Gaia Nicosia
Gaia Nicosia
Roma Tre University, Dipartimento di Ingegneria, Rome Italy
Email verificata su ing.uniroma3.it - Home page
Titolo
Citata da
Citata da
Anno
Optimally balancing assembly lines with different workstations
G Nicosia, D Pacciarelli, A Pacifici
Discrete Applied Mathematics 118 (1-2), 99-113, 2002
932002
A job-shop problem with one additional resource type
A Agnetis, M Flamini, G Nicosia, A Pacifici
Journal of Scheduling 14 (3), 225-237, 2011
652011
The subset sum game
A Darmann, G Nicosia, U Pferschy, J Schauer
European Journal of Operational Research 233 (3), 539-549, 2014
222014
An approximate A∗ algorithm and its application to the SCS problem
G Nicosia, G Oriolo
Theoretical Computer Science 290 (3), 2021-2029, 2003
222003
Price of fairness for allocating a bounded resource
G Nicosia, A Pacifici, U Pferschy
European Journal of Operational Research 257 (3), 933-943, 2017
192017
A heuristic approach to batching and scheduling a single machine to minimize setup costs
A Agnetis, A Alfieri, G Nicosia
Computers & Industrial Engineering 46 (4), 793-802, 2004
192004
Two agents competing for a shared machine
A Agnetis, G Nicosia, A Pacifici, U Pferschy
International Conference on Algorithmic DecisionTheory, 1-14, 2013
172013
Parallel dedicated machines scheduling with chain precedence constraints
A Agnetis, H Kellerer, G Nicosia, A Pacifici
European Journal of Operational Research 221 (2), 296-305, 2012
162012
Scheduling three chains on two parallel machines
A Agnetis, M Flamini, G Nicosia, A Pacifici
European Journal of Operational Research 202 (3), 669-674, 2010
152010
Competitive subset selection with two agents
G Nicosia, A Pacifici, U Pferschy
Discrete Applied Mathematics 159 (16), 1865-1877, 2011
132011
Minimum cost multi-product flow lines
A Alfieri, G Nicosia
Annals of Operations Research 150 (1), 31-46, 2007
132007
Strategies in competing subset selection
C Marini, G Nicosia, A Pacifici, U Pferschy
Annals of Operations Research 207 (1), 181-200, 2013
122013
Scheduling two agent task chains with a central selection mechanism
A Agnetis, G Nicosia, A Pacifici, U Pferschy
Journal of Scheduling 18 (3), 243-261, 2015
102015
Part batching and scheduling in a flexible cell to minimize setup costs
A Agnetis, A Alfieri, G Nicosia
Journal of Scheduling 6 (1), 87-108, 2003
102003
Group Technology with flow shop cells
S Nicoletti, G Nicosia, A Pacifici
Theory and Practice of Control and Systems, 800-804, 1998
101998
On-line scheduling with setup costs
G Gambosi, G Nicosia
Information processing letters 73 (1-2), 61-68, 2000
92000
Maximin fairness in project budget allocation
M Naldi, G Nicosia, A Pacifici, U Pferschy
Electronic Notes in Discrete Mathematics 55, 65-68, 2016
82016
Minimizing part transfer costs in flexible manufacturing systems: A computational study on different lower bounds
G Falcone, G Nicosia, A Pacifici
2013 UKSim 15th International Conference on Computer Modelling andá…, 2013
72013
On-line load balancing made simple: Greedy strikes back
P Crescenzi, G Gambosi, G Nicosia, P Penna, W Unger
Journal of Discrete Algorithms 5 (1), 162-175, 2007
72007
Scheduling assembly tasks with caterpillar precedence constraints on dedicated machines
G Nicosia, A Pacifici
International Journal of Production Research 55 (6), 1680-1691, 2017
62017
Il sistema al momento non pu˛ eseguire l'operazione. Riprova pi¨ tardi.
Articoli 1–20