Segui
Mohammad Ranjbar
Titolo
Citata da
Citata da
Anno
A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
M Ranjbar, B De Reyck, F Kianfar
European Journal of Operational Research 193 (1), 35-48, 2009
1952009
Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
M Ranjbar, F Kianfar, S Shadrokh
Applied Mathematics and Computation 196 (2), 879-888, 2008
1082008
Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
MR Ranjbar, F Kianfar
Applied Mathematics and Computation 191 (2), 451-456, 2007
632007
Solving the resource-constrained project scheduling problem using filter-and-fan approach
M Ranjbar
Applied mathematics and computation 201 (1-2), 313-318, 2008
532008
Two branch-and-bound algorithms for the robust parallel machine scheduling problem
M Ranjbar, M Davari, R Leus
Computers & Operations Research 39 (7), 1652-1660, 2012
512012
A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions
N Jamili, M Ranjbar, M Salari
Journal of Manufacturing Systems 40, 105-118, 2016
472016
An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem
M Ranjbar, M Khalilzadeh, F Kianfar, K Etminani
Computers & Industrial Engineering 62 (1), 264-270, 2012
422012
Resource-constrained project scheduling problem with flexible work profiles: a genetic algorithm approach
M Ranjbar, F Kianfar
SCIENTIA IRANICA 17 (1), 25-35, 2010
392010
A two-stage stochastic programming approach for a multi-objective course timetabling problem with courses cancelation risk
P Yasari, M Ranjbar, N Jamili, MH Shaelaie
Computers & Industrial Engineering 130, 650-660, 2019
322019
Multi-mode renewable resource-constrained allocation in PERT networks
S Baradaran, SMTF Ghomi, M Ranjbar, SS Hashemin
Applied Soft Computing 12 (1), 82-90, 2012
302012
A path-relinking metaheuristic for the resource levelling problem
M Ranjbar
Journal of the Operational Research Society 64 (7), 1071-1078, 2013
292013
A hybrid metaheuristic for concurrent layout and scheduling problem in a job shop environment
M Ranjbar, MN Razavi
The International Journal of Advanced Manufacturing Technology 62, 1249-1260, 2012
292012
Minimizing total weighted late work in the resource-constrained project scheduling problem
M Ranjbar, S Hosseinabadi, F Abasian
Applied Mathematical Modelling 37 (23), 9776-9785, 2013
282013
A modified PSO algorithm for minimizing the total costs of resources in MRCPSP
M Khalilzadeh, F Kianfar, A Shirzadeh Chaleshtari, S Shadrokh, ...
Mathematical Problems in Engineering 2012, 2012
272012
Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem
RG Saber, M Ranjbar
Computers & Operations Research 138, 105604, 2022
262022
Scheduling of loading and unloading operations in a multi stations transshipment terminal with release date and inventory constraints
A Bazgosha, M Ranjbar, N Jamili
Computers & Industrial Engineering 106, 20-31, 2017
222017
Maximizing the expected net present value in a project with uncertain cash flows
M Peymankar, M Davari, M Ranjbar
European Journal of Operational Research, 2021
212021
A HYBRID SCATTER SEARCH FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
M Ranjbar, F Kianfar
SCIENTIA IRANICA 16 (1), 11-18, 2009
202009
Minimizing makespan on a single machine with release dates and inventory constraints
M Davari, M Ranjbar, P De Causmaecker, R Leus
European Journal of Operational Research 286 (1), 115-128, 2020
152020
Minimizing the total weighted late work in scheduling of identical parallel processors with communication delays
F Abasian, M Ranjbar, M Salari, M Davari, SM Khatami
Applied Mathematical Modelling 38 (15-16), 3975-3986, 2014
152014
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20