Paolo Trucco
TitleCited byYear
A Bayesian Belief Network modelling of organisational factors in risk analysis: A case study in maritime transportation
P Trucco, E Cagno, F Ruggeri, O Grande
Reliability Engineering & System Safety 93 (6), 845-856, 2008
4292008
Economic features of integral, modular, small-to-medium size reactors
MD Carelli, P Garrone, G Locatelli, M Mancini, C Mycoff, P Trucco, ...
Progress in Nuclear Energy 52 (4), 403-414, 2010
1512010
Cleaner production and profitability: analysis of 134 industrial pollution prevention (P2) project reports
E Cagno, P Trucco, L Tardini
Journal of Cleaner Production 13 (6), 593-605, 2005
1282005
A quantitative approach to clinical risk assessment: the CREA method
P Trucco, M Cavallin
Safety science 44 (6), 491-513, 2006
792006
Influential Factors in Becoming Socially Embedded in Low-Income Markets.
P Sánchez, JE Ricart, MÁ Rodríguez
Greener Management International, 2006
762006
Applying failure mode effects and criticality analysis in radiotherapy: lessons learned and perspectives of enhancement
M Scorsetti, C Signori, P Lattuada, G Urso, M Bignardi, P Navarria, ...
Radiotherapy and Oncology 94 (3), 367-374, 2010
662010
Dynamic functional modelling of vulnerability and interoperability of Critical Infrastructures
P Trucco, E Cagno, M De Ambroggi
Reliability Engineering & System Safety 105, 51-63, 2012
632012
Quick-E-scan: A methodology for the energy scan of SMEs
E Cagno, P Trucco, A Trianni, G Sala
Energy 35 (5), 1916-1926, 2010
622010
Modelling and assessment of dependent performance shaping factors through Analytic Network Process
M De Ambroggi, P Trucco
Reliability Engineering & System Safety 96 (7), 849-860, 2011
442011
A probabilistic cognitive simulator for HRA studies (PROCOS)
P Trucco, MC Leva
Reliability Engineering & System Safety 92 (8), 1117-1130, 2007
442007
Risk analysis of underground infrastructures in urban areas
E Cagno, M De Ambroggi, O Grande, P Trucco
Reliability Engineering & System Safety 96 (1), 139-148, 2011
422011
Eco-efficiency for sustainable manufacturing: an extended environmental costing method
E Cagno, GJL Micheli, P Trucco
Production Planning & Control 23 (2-3), 134-144, 2012
412012
Risk and causes-of-risk assessment for an effective industrial safety management
E Cagno, A DI GIULIO, P Trucco
International Journal of Reliability, Quality and Safety Engineering 7 (02 …, 2000
322000
Analysis of maritime accident data with BBN models
P Antão, O Grande, P Trucco, CG Soares, S Martorell, J Barnett
Safety, reliability and risk analysis: theory, methods and applications 2 …, 2009
312009
Understanding dynamism and complexity factors in engineer-to-order and their influence on lean implementation strategy
SE Birkie, P Trucco
Production Planning & Control 27 (5), 345-359, 2016
272016
An algorithm for the implementation of safety improvement programs
E Cagno, A Di Giulio, P Trucco
Safety Science 37 (1), 59-75, 2001
272001
Smaller sized reactors can be economically attractive
MD Carelli, B Petrovic, CW Mycoff, P Trueco, ME Ricotti, G Locatelli
International Congress on Advances in Nuclear Power Plants (ICAPP 2007): The …, 2008
262008
Economic comparison of different size nuclear reactors
MD Carelli, B Petrovic, CW Mycoff, P Trucco, ME Ricotti, G Locatelli
Cancún, Quintana Roo, México, del 1, 1-5, 2007
262007
Cleaner technology transfer in the Italian galvanic industry: economic and know-how issues
E Cagno, P Trucco
Journal of Cleaner Production 16 (1), S32-S36, 2008
252008
Towards enhanced collaboration and information sharing for Critical Infrastructure resilience: Current barriers and emerging capabilities
B Petrenj, E Lettieri, P Trucco
International Journal of Critical Infrastructures 4 8 (2-3), 107-120, 2012
242012
The system can't perform the operation now. Try again later.
Articles 1–20