Iris D. Tommelein, NAC
Iris D. Tommelein, NAC
Professor of Civil and Environmental Engineering, University of California, Berkeley, USA
Email verificata su berkeley.edu - Home page
Titolo
Citata da
Citata da
Anno
The foundations of lean construction
L Koskela, G Howell, G Ballard, I Tommelein
Design and construction, 211-226, 2007
6562007
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
ID Tommelein
Journal of construction engineering and management 124 (4), 279-288, 1998
4971998
Parade game: Impact of work flow variability on trade performance
ID Tommelein, DR Riley, GA Howell
Journal of construction engineering and management 125 (5), 304-310, 1999
4431999
Value stream analysis of a re-engineered construction supply chain
R Arbulu, I Tommelein, K Walsh, J Hershauer
Building Research & Information 31 (2), 161-171, 2003
2752003
2020 Current process benchmark for the last planner (R) system of project planning and control
G Ballard, I Tommelein
2722021
Understanding project success through analysis of project management approach
A Rolstadås, I Tommelein, P Morten Schiefloe, G Ballard
International journal of managing projects in business 7 (4), 638-660, 2014
2612014
Takt time planning for construction of exterior cladding
A Frandson, K Berghede, ID Tommelein
21st Annual Conference of the International Group for Lean Construction …, 2013
2252013
Dynamic layout planning using a hybrid incremental solution method
PP Zouein, ID Tommelein
Journal of construction engineering and management 125 (6), 400-408, 1999
2201999
Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration
ID Tommelein, A Li
Proceedings iglc 7, 97, 1999
2181999
Lean construction tools and techniques
G Ballard, I Tommelein, L Koskela, G Howell
Design and construction, 227-255, 2007
2062007
Interactive dynamic layout planning
ID Tommelein, PP Zouein
Journal of construction engineering and management 119 (2), 266-287, 1993
2051993
WorkPlan: Constraint-based database for work package scheduling
HJ Choo, ID Tommelein, G Ballard, TR Zabelle
Journal of Construction Engineering and Management 125 (3), 151-160, 1999
1911999
Rethinking Lookahead Planning to Optimize Construction Workflow.
F Hamzeh, G Ballard, ID Tommelein
Lean construction journal, 2012
1862012
Coordinating specialists
ID Tommelein, G Ballard
1421997
SightPlan experiments: Alternate strategies for site layout design
ID Tommelein, RE Levitt, B Hayes-Roth, T Confrey
Journal of computing in civil engineering 5 (1), 42-63, 1991
1421991
Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design
P Arroyo, ID Tommelein, G Ballard
Journal of construction engineering and management 141 (1), 04014063, 2015
1412015
Lean management methods for complex projects
G Ballard, I Tommelein
Engineering project organization journal 2 (1-2), 85-96, 2012
1382012
Is the Last Planner System applicable to design? A case study
FR Hamzeh, G Ballard, ID Tommelein
Proceedings of the 17th Annual Conference of the International Group for …, 2009
1372009
DePlan: a tool for integrated design management
HJ Choo, J Hammond, ID Tommelein, SA Austin, G Ballard
Automation in Construction 13 (3), 313-326, 2004
1332004
More just-in-time: Location of buffers in structural steel supply and construction processes
ID Tommelein, M Weissenberger
Proceedings IGLC 7, 109, 1999
1291999