Claudio Arbib
Claudio Arbib
Full professor of Operations Research, Università degli Studi dell'Aquila
Email verificata su univaq.it
Titolo
Citata da
Citata da
Anno
Integrating process optimization and inventory planning in cutting-stock with skiving option: An optimization model and its application
C Arbib, F Marinelli
European Journal of Operational Research 163 (3), 617-630, 2005
622005
A three-dimensional matching model for perishable production scheduling
C Arbib, D Pacciarelli, S Smriglio
Discrete Applied Mathematics 92 (1), 1-15, 1999
611999
Optimal resource assignment through negotiation in a multi-agent manufacturing system
C Arbib, F Rossi
Iie Transactions 32 (10), 963-974, 2000
392000
On cutting stock with due dates
C Arbib, F Marinelli
Omega 46, 11-20, 2014
382014
Part routing in flexible assembly systems
A Agnetis, C Arbib, M Lucertini, F Nicolo
IEEE Transactions on Robotics and Automation 6 (6), 697-705, 1990
351990
Workload balance and part-transfer minimization in flexible manufacturing systems
C Arbib, M Lucertini, F Nicolò
International Journal of Flexible Manufacturing Systems 3 (1), 5-25, 1991
341991
One‐dimensional cutting stock with a limited number of open stacks: bounds and solutions from a new integer linear programming model
C Arbib, F Marinelli, P Ventura
International Transactions in Operational Research 23 (1-2), 47-63, 2016
332016
On (P5, diamond)-free graphs
C Arbib, R Mosca
Discrete mathematics 250 (1-3), 1-22, 2002
332002
Cutting and reuse: An application from automobile component manufacturing
C Arbib, F Marinelli, F Rossi, F Di Iorio
Operations Research 50 (6), 923-934, 2002
312002
A competitive scheduling problem and its relevance to UMTS channel assignment
C Arbib, S Smriglio, M Servilio
Networks: An International Journal 44 (2), 132-141, 2004
292004
A QoS concept for packet oriented S-UMTS services
D Schultz, SH Oh, CF Grecas, M Albani, J Sanchez, C Arbib, V Arvia, ...
IST Mobile and Wireless Telecommunications Summit, 2002
272002
Task assignment and subassembly scheduling in flexible assembly lines
A Agnetis, F Nicolo, C Arbib, M Lucertini
IEEE Transactions on Robotics and Automation 11 (1), 1-20, 1995
221995
Maximum lateness minimization in one-dimensional bin packing
C Arbib, F Marinelli
Omega 68, 76-84, 2017
192017
Real-time emergency response through performant IoT architectures
C Arbib, D Arcelli, J Dugdale, M Moghaddam, H Muccini
International Conference on Information Systems for Crisis Response and …, 2019
172019
A polynomial characterization of some graph partitioning problems
C Arbib
Information processing letters 26 (5), 223-230, 1988
171988
An LP-based tabu search for batch scheduling in a cutting process with finite buffers
C Arbib, F Marinelli, F Pezzella
International Journal of Production Economics 136 (2), 287-296, 2012
162012
On LP relaxations for the pattern minimization problem
A Aloisio, C Arbib, F Marinelli
Networks 57 (3), 247-253, 2011
162011
Cutting stock with no three parts per pattern: Work-in-process and pattern minimization
A Aloisio, C Arbib, F Marinelli
Discrete Optimization 8 (2), 315-332, 2011
162011
Predicting deadlock in store‐and‐forward networks
C Arbib, GF Italiano, A Panconesl
Networks 20 (7), 861-881, 1990
161990
An optimization model for trim loss minimization in an automotive glass plant
C Arbib, F Marinelli
European journal of operational research 183 (3), 1421-1432, 2007
152007
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20