Segui
Ebrahim Shayan
Ebrahim Shayan
Affiliazione sconosciuta
Nessuna email verificata
Titolo
Citata da
Citata da
Anno
Investigation of port capacity under a new approach by computer simulation
M Kia, E Shayan, F Ghotb
Computers & industrial engineering 42 (2-4), 533-540, 2002
2452002
The importance of information technology in port terminal operations
M Kia, E Shayan, F Ghotb
International Journal of Physical Distribution & Logistics Management 30 (3 …, 2000
2312000
Genetic algorithm for facilities layout problems based on slicing tree structure
E Shayan*, A Chittilappilly
International Journal of Production Research 42 (19), 4055-4067, 2004
1302004
Facilities layout design by genetic algorithms
R Tavakkoli-Moghaddain, E Shayan
Computers & industrial engineering 35 (3-4), 527-530, 1998
1061998
Analysis of roughness of a sanded wood surface
B Hendarto, E Shayan, B Ozarska, R Carr
The International Journal of Advanced Manufacturing Technology 28, 775-780, 2006
1002006
A fuzzy logic modelling of dynamic scheduling in FMS
P Srinoi, E Shayan, F Ghotb
International Journal of Production Research 44 (11), 2183-2203, 2006
352006
Layout design of a furniture production line using formal methods
WJ PINTO, F Shayan
JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE) 1 (1), 81-96, 2007
342007
Cost estimation in flat plate processing using fuzzy sets
H Jahan-Shahi, E Shayan, S Masood
Computers & industrial engineering 37 (1-2), 485-488, 1999
321999
Multivalued fuzzy sets in cost/time estimation of flat plate processing
H Jahan-Shahi, E Shayan, SH Masood
The International Journal of Advanced Manufacturing Technology 17, 751-759, 2001
312001
An investigation into design and manufacturing of mechanical conveyors systems for food processing
SH Masood, B Abbas, E Shayan, A Kara
The International Journal of Advanced Manufacturing Technology 25, 551-559, 2005
292005
Positive impact of distribution centres on the environment
M Kia, E Shayan, F Ghotb
Transport reviews 23 (1), 105-122, 2003
242003
Scheduling of flexible manufacturing systems using fuzzy logic
P Srinoi, E Shayan, F Ghotb
International Journal of Production Research 44 (11), 1-21, 2002
222002
Productivity gains by cellular manufacturing
E Shayan, A Sobhanallahi
Production planning & control 13 (6), 507-516, 2002
192002
Modelling of a continuous food pressing process by dimensional analysis
E Thurairajasingam, E Shayan, S Masood
Computers & industrial engineering 42 (2-4), 343-351, 2002
152002
Tool management in flexible manufacturing systems
E Shayan, CL Liu
Integrated Manufacturing Systems 6 (4), 26-35, 1995
151995
Integrated material planning and operations scheduling (IMPOS)
H Fallah, E Shayan
International journal of production research 40 (16), 4285-4304, 2002
132002
Reliability analysis of a cooling seawater pumping station
MJ AlSalamah, E Shayan, M Savsar
International Journal of Quality & Reliability Management 23 (6), 670-695, 2006
122006
Cloning in layout design problems: a genetic algorithm approach
E Shayan, L Al-Hakim
Proceedings of the Fifteenth International Conference on Production Research …, 1999
111999
Improved methods in solutions of unequal-sized facilities layout problems by genetic algorithms
E Shayan, L Al-Hakim
Proceedings of the Advanced Manufacturing Processes, Systems, and …, 1999
101999
Lean strategies for furniture manufacturing
S Sabri, E Shayan
Proceedings of the Fifth Asia Pacific Industrial Engineering and Management …, 2004
92004
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20