Taho Yang
Taho Yang
Email verificata su mail.ncku.edu.tw - Home page
Titolo
Citata da
Citata da
Anno
The use of grey relational analysis in solving multiple attribute decision-making problems
Y Kuo, T Yang, GW Huang
Computers & industrial engineering 55 (1), 80-93, 2008
6392008
Multiple-attribute decision making methods for plant layout design problem
T Yang, CC Hung
Robotics and computer-integrated manufacturing 23 (1), 126-137, 2007
5092007
A hierarchical AHP/DEA methodology for the facilities layout design problem
T Yang, C Kuo
European Journal of Operational Research 147 (1), 128-136, 2003
4572003
Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method
T Yang, P Chou
Mathematics and Computers in simulation 68 (1), 9-21, 2005
1762005
Flexible machine layout design for dynamic and uncertain production environments
T Yang, BA Peters
European Journal of Operational Research 108 (1), 49-64, 1998
1581998
Systematic layout planning: a study on semiconductor wafer fabrication facilities
T Yang, CT Su, YR Hsu
International Journal of Operations & Production Management, 2000
1442000
Integrated facility layout and material handling system design in semiconductor fabrication facilities
BA Peters, T Yang
IEEE Transactions on Semiconductor manufacturing 10 (3), 360-369, 1997
1431997
Six-Sigma project selection using national quality award criteria and Delphi fuzzy multiple criteria decision-making method
T Yang, CH Hsieh
Expert Systems with Applications 36 (4), 7594-7603, 2009
1352009
The use of a grey-based Taguchi method for optimizing multi-response simulation problems
Y Kuo, T Yang, GW Huang
Engineering Optimization 40 (6), 517-528, 2008
1342008
A genetic algorithm for facility layout design in flexible manufacturing systems
M Rajasekharan, BA Peters, T Yang
International journal of Production research 36 (1), 95-110, 1998
1311998
Evaluating the supply chain performance of IT-based inter-enterprise collaboration
MC Chen, T Yang, HC Li
Information & Management 44 (6), 524-534, 2007
1302007
A neural-network approach for semiconductor wafer post-sawing inspection
CT Su, T Yang, CM Ke
IEEE Transactions on Semiconductor Manufacturing 15 (2), 260-266, 2002
1102002
Multiple attribute decision-making methods for the dynamic operator allocation problem
T Yang, MC Chen, CC Hung
Mathematics and computers in simulation 73 (5), 285-299, 2007
1062007
Layout design for flexible manufacturing systems considering single-loop directional flow patterns
T Yang, BA Peters, M Tu
European Journal of Operational Research 164 (2), 440-455, 2005
992005
Lean production system design for fishing net manufacturing using lean principles and simulation optimization
T Yang, Y Kuo, CT Su, CL Hou
Journal of Manufacturing Systems 34, 66-73, 2015
852015
Evaluation of robustness of supply chain information-sharing strategies using a hybrid Taguchi and multiple criteria decision-making method
T Yang, YF Wen, FF Wang
International Journal of Production Economics 134 (2), 458-466, 2011
772011
A lean pull system design analysed by value stream mapping and multiple criteria decision-making method under demand uncertainty
JC Lu, T Yang, CY Wang
International Journal of Computer Integrated Manufacturing 24 (3), 211-228, 2011
772011
A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem
T Yang, Y Kuo, C Cho
European Journal of Operational Research 176 (3), 1859-1873, 2007
762007
Investigating the value of information sharing in multi-echelon supply chains
MC Chen, T Yang, CT Yen
Quality & quantity 41 (3), 497-511, 2007
712007
Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors—a case study
T Yang*, Y Kuo, I Chang
International Journal of Production Research 42 (19), 4015-4030, 2004
692004
Il sistema al momento non pu eseguire l'operazione. Riprova pi tardi.
Articoli 1–20