Segui
Neda Manavizadeh
Neda Manavizadeh
KHATAM University
Email verificata su khatam.ac.ir
Titolo
Citata da
Citata da
Anno
A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach
N Manavizadeh, N Hosseini, M Rabbani, F Jolai
Computers & industrial engineering 64 (2), 669-685, 2013
1352013
Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout
M Rabbani, M Moghaddam, N Manavizadeh
The International Journal of Advanced Manufacturing Technology 59, 1191-1210, 2012
822012
Mixed model U-line balancing type-1 problem: A new approach
M Rabbani, SM Kazemi, N Manavizadeh
Journal of Manufacturing Systems 31 (2), 131-138, 2012
652012
Mixed-model assembly line balancing in the make-to-order and stochastic environment using multi-objective evolutionary algorithms
N Manavizadeh, M Rabbani, D Moshtaghi, F Jolai
Expert Systems with Applications 39 (15), 12026-12031, 2012
592012
A multi-objective mixed-model assembly line sequencing problem in order to minimize total costs in a Make-To-Order environment, considering order priority
N Manavizadeh, L Tavakoli, M Rabbani, F Jolai
Journal of Manufacturing Systems 32 (1), 124-137, 2013
392013
A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm
N Manavizadeh, M Rabbani, F Radmehr
The International Journal of Advanced Manufacturing Technology 79, 415-425, 2015
362015
Order acceptance/rejection policies in determining the sequence in mixed model assembly lines
N Manavizadeh, AH Goodarzi, M Rabbani, F Jolai
Applied Mathematical Modelling 37 (4), 2531-2551, 2013
332013
A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line
M Mokhtarzadeh, M Rabbani, N Manavizadeh
Applied Mathematical Modelling 93, 597-617, 2021
282021
Designing a multi-objective model for a hazardous waste routing problem considering flexibility of routes and social effects
E Araee, N Manavizadeh, S Aghamohammadi Bosjin
Journal of Industrial and Production Engineering 37 (1), 33-45, 2020
272020
Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach
M Rabbani, F Jolai, N Manavizadeh, F Radmehr, B Javadi
The International Journal of Advanced Manufacturing Technology 58, 709-722, 2012
222012
Multi-objective optimization algorithms for mixed model assembly line balancing problem with parallel workstations
M Rabbani, R Siadatian, H Farrokhi-Asl, N Manavizadeh
Cogent Engineering 3 (1), 1158903, 2016
212016
Proactive and reactive inventory policies in humanitarian operations
M Rabbani, N Manavizadeh, M Samavati, M Jalali
Uncertain Supply Chain Management 3 (3), 253-272, 2015
202015
Mixed-model assembly line balancing in assemble-to-order environment with considering express parallel line: problem definition and solution procedure
M Rabbani, A Ziaeifar, N Manavizadeh
International Journal of Computer Integrated Manufacturing 27 (7), 690-706, 2014
182014
Using a metaheuristic algorithm for solving a home health care routing and scheduling problem
N Manavizadeh, H Farrokhi-Asl, P Beiraghdar
Journal of Project Management 5 (1), 27-40, 2020
172020
Using Robust-DEA optimization approach to analyze performance and efficiency of a mine in north of Iran
M Rabbani, H Farrokhi-Asl, N Manavizadeh
Management Science Letters 7 (2), 97-110, 2017
172017
A constraint programming approach and a hybrid of genetic and K-means algorithms to solve the p-hub location-allocation problems
M Rabbani, M Mokhtarzadeh, N Manavizadeh
International Journal of Management Science and Engineering Management 16 (2 …, 2021
132021
A novel bi-level hierarchy towards available-to-promise in mixed-model assembly line sequencing problems
M Rabbani, S Sadri, N Manavizadeh, H Rafiei
Engineering Optimization 47 (7), 947-962, 2015
132015
A stochastic model for indirect condition monitoring using proportional covariate model
M Rabani, N Manavizadeh, S Balali
INTERNATIONAL JOURNAL OF ENGINEERING 21 (1), 45-56, 2008
132008
Robust optimization approach to production system with failure in rework and breakdown under uncertainty: evolutionary methods
M Rabbani, N Manavizadeh, NS Hosseini Aghozi
Assembly Automation 35 (1), 81-93, 2015
112015
Multi-objective multiple allocation hub location problem with multiple capacity levels considering sustainable development paradigm
L Tavakoli, N Manavizadeh, M Rabbani
International Journal of Applied Decision Sciences 3 7 (3), 295-326, 2014
112014
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20