Follow
Umberto Carlo Gatti
Umberto Carlo Gatti
Verified email at uw.edu
Title
Cited by
Cited by
Year
Data fusion of real-time location sensing and physiological status monitoring for ergonomics analysis of construction workers
T Cheng, GC Migliaccio, J Teizer, UC Gatti
Journal of Computing in Civil engineering 27 (3), 320-335, 2013
2272013
Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data
T Cheng, J Teizer, GC Migliaccio, UC Gatti
Automation in Construction 29, 24-39, 2013
2172013
Physiological condition monitoring of construction workers
UC Gatti, S Schneider, GC Migliaccio
Automation in Construction 44, 227-233, 2014
1462014
An exploratory study of the relationship between construction workforce physical strain and task level productivity
UC Gatti, GC Migliaccio, SM Bogus, S Schneider
Construction management and economics 32 (6), 548-564, 2014
832014
A user-centered information and communication technology (ICT) tool to improve safety inspections
KY Lin, MH Tsai, UC Gatti, JJC Lin, CH Lee, SC Kang
Automation in construction 48, 53-63, 2014
702014
Wearable physiological status monitors for measuring and evaluating workers' physical strain: Preliminary validation
UC Gatti, GC Migliaccio, S Schneider
Computing in Civil Engineering (2011), 194-201, 2011
412011
Guide for design management on design-build and construction manager/general contractor projects
E Minchin, L Ptschelinzew, GC Migliaccio, U Gatti, K Atkins, T Warne, ...
NCHRP report, 2014
342014
Using workforce’s physiological strain monitoring to enhance social sustainability of construction
U Gatti, G Migliaccio, SM Bogus, S Priyadarshini, A Scharrer
Journal of architectural engineering 19 (3), 179-185, 2013
312013
Automatic identification of unsafe bending behavior of construction workers using real-time location sensing and physiological status monitoring
GC Migliaccio, J Teizer, T Cheng, UC Gatti
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
212012
Design management in design-build megaprojects: SR 99 bored tunnel case study
UC Gatti, GC Migliaccio, L Laird
Practice Periodical on Structural Design and Construction 19 (1), 148-158, 2014
192014
Using wearable physiological status monitors for analyzing the physical strain-productivity relationship for construction tasks
UC Gatti, GC Migliaccio, SM Bogus, S Schneider
Computing in Civil Engineering (2012), 577-585, 2012
182012
A study on the influence of construction workers’ physiological status and jobsite environment on behaviour and performance
UC Gatti, GC Migliaccio
49th ASC annual international conference proceedings, 10-13, 2013
142013
Assessing physical strain in construction workforce: A first step for improving safety and productivity management
UC Gatti, GC Migliaccio, S Schneider, R Fierro
Proceedings, 27th international symposium on automation and robotics in …, 2010
122010
Data fusion of real-time location sensing (RTLS) and physiological status monitoring (PSM) for ergonomics analysis of construction workers
GC Migliaccio, T Cheng, UC Gatti, J Teizer
the 19th Triennial CIB World Building Congress, Brisbane, Queensland, Australia, 2013
92013
Measuring and evaluating physical strain to improve construction workforce productivity
UC Gatti
The University of New Mexico, 2012
72012
Automating the task-level construction activity analysis through fusion of real time location sensors and workers' thoracic posture data
T Cheng, J Teizer, GC Migliaccio, U Gatti
Computing in Civil Engineering (2013), 629-636, 2013
62013
Remote construction worker location, activity and safety monitoring
G Migliaccio, U Gatti, J Teizer
Proceedings of 28th International Symposium on Automation and Robotics in …, 2011
62011
Exploring the relationship between chronic sleep deprivation and safety on construction sites
UC Gatti, KY Lin, C Caldera, R Chiang
Construction Research Congress 2014: Construction in a Global Network, 1772-1781, 2014
32014
WSDOT Building Asset Management An Exploratory Case Study Impact of Failures at the Corson Avenue TEF Shop on WSDOT Services
O El-Anwar, G Migliaccio, KY Lin, U Gatti, Y Medina
22013
BEST PRACTICES FOR THE DESIGN PROCESS FOR THE HORIZONTAL DESIGN-BUILDER
GC MIGLIACCIO, RE MINCHIN, UC GATTI, L PTSCHELINZEW, ...
2019
The system can't perform the operation now. Try again later.
Articles 1–20