Cemalettin Öztürk
Cemalettin Öztürk
United Technologies Research Center
Verified email at utrc.utc.com - Homepage
TitleCited byYear
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
242010
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
222010
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18 (3), 434-469, 2013
202013
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67 (9-12 …, 2013
182013
Operational extended model formulations for Advanced Planning and Scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
142014
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunali, B Hnich, A Ornek
Journal of Manufacturing Systems 36, 147-158, 2015
132015
A note on “A mixed integer programming model for advanced planning and scheduling (APS)”
A Örnek, S Özpeynirci, C Öztürk
European Journal of Operational Research 203 (3), 784-785, 2010
122010
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
92016
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
92012
Designing an Optical Island in the Core Network: From Routing to Spectrum Allocation
D Mehta, B OSullivan, C Ozturk, L Quesada, H Simonis
Tools with Artificial Intelligence (ICTAI), 2014 IEEE 26th International …, 2014
62014
Balancing and scheduling of flexible mixed model assembly lines
C Oztürk, S Tunalı, B Hnich, A Ornek
Constraints 18 (3), 434-469, 2013
52013
A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, MA Örnek
IFAC Proceedings Volumes 45 (6), 420-425, 2012
52012
Computing distance-bounded node-disjoint paths for all pairs of nodes—An application to optical core network design
D Mehta, B O'Sullivan, C Ozturk, L Quesada
Reliable Networks Design and Modeling (RNDM), 2015 7th International …, 2015
42015
Empowering and engaging industrial workers with Operator 4.0 solutions
E Kaasinen, F Schmalfuß, C Özturk, S Aromaa, M Boubekeur, J Heilala, ...
Computers & Industrial Engineering, 2019
32019
Object detection at 200 frames per second
R Mehta, C Ozturk
Proceedings of the European Conference on Computer Vision (ECCV), 0-0, 2018
32018
Simultaneous balancing and scheduling of flexible mixed model assembly lines
C Öztürk
Izmir: Dokuz Eylül University, The Graduate School of Natural and Applied …, 2013
22013
Moreopt: A goal programming based movie recommender system
E Inan, F Tekbacak, C Ozturk
Journal of computational science 28, 43-50, 2018
12018
Optimisation and heuristic approaches for assigning inbound containers to outbound carriers
C Öztürk, FZ Sargut, MA Örnek, D Türsel Eliiyi
Maritime Policy & Management 44 (7), 825-836, 2017
12017
Developing a Mathematical Model for Scheduling of Turnaround Operations (Low Cost Airline as a Case Study)
A Al-Bazi, YS Gok, C Ozturk, D Guimarans
3rd International Aviation Management Conference, 16-25, 2016
12016
A scalable approach for computing distance-bounded node-disjoint paths in optical networks
A Arbelaez, D Mehta, B O'Sullivan, C Ozturk, L Quesada
2015 17th International Conference on Transparent Optical Networks (ICTON), 1-4, 2015
12015
The system can't perform the operation now. Try again later.
Articles 1–20