The distributed permutation flowshop scheduling problem B Naderi, R Ruiz Computers & Operations Research 37 (4), 754-768, 2010 | 248 | 2010 |
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness B Naderi, M Zandieh, AKG Balagh, V Roshanaei Expert systems with Applications 36 (6), 9625-9633, 2009 | 190 | 2009 |
A scatter search algorithm for the distributed permutation flowshop scheduling problem B Naderi, R Ruiz European Journal of Operational Research 239 (2), 323-334, 2014 | 143 | 2014 |
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan B Naderi, R Tavakkoli-Moghaddam, M Khalili Knowledge-Based Systems 23 (2), 77-85, 2010 | 123 | 2010 |
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness B Naderi, M Zandieh, V Roshanaei The International Journal of Advanced Manufacturing Technology 41 (11-12 …, 2009 | 118 | 2009 |
A variable neighborhood search for job shop scheduling with set-up times to minimize makespan V Roshanaei, B Naderi, F Jolai, M Khalili Future Generation Computer Systems 25 (6), 654-661, 2009 | 112 | 2009 |
Algorithms for a realistic variant of flowshop scheduling B Naderi, R Ruiz, M Zandieh Computers & Operations Research 37 (2), 236-246, 2010 | 107 | 2010 |
Iterated Greedy methods for the distributed permutation flowshop scheduling problem R Ruiz, QK Pan, B Naderi Omega 83, 213-222, 2019 | 102 | 2019 |
A hybrid multi-population genetic algorithm for the dynamic facility layout problem H Pourvaziri, B Naderi Applied Soft Computing 24, 457-469, 2014 | 101 | 2014 |
Scheduling sequence-dependent setup time job shops with preventive maintenance B Naderi, M Zandieh, SMTF Ghomi The International Journal of Advanced Manufacturing Technology 43 (1-2), 170, 2009 | 82 | 2009 |
Scheduling open shops with parallel machines to minimize total completion time B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh Journal of Computational and Applied Mathematics 235 (5), 1275-1287, 2011 | 69 | 2011 |
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times B Naderi, SMTF Ghomi, M Aminnayeri Applied Soft Computing 10 (3), 703-710, 2010 | 65 | 2010 |
A novel imperialist competitive algorithm for generalized traveling salesman problems Z Ardalan, S Karimi, O Poursabzi, B Naderi Applied Soft Computing 26, 546-555, 2015 | 62 | 2015 |
Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm S Karimi, Z Ardalan, B Naderi, M Mohammadi Applied mathematical modellíng 41, 667-682, 2017 | 61 | 2017 |
Scheduling job shop problems with sequence-dependent setup times B Naderi, M Zandieh, SMT Fatemi Ghomi International journal of production research 47 (21), 5959-5976, 2009 | 61 | 2009 |
Clustering and ranking university majors using data mining and AHP algorithms: A case study in Iran A Rad, B Naderi, M Soltani Expert Systems with Applications 38 (1), 755-763, 2011 | 60 | 2011 |
A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total … R Tavakkoli-Moghaddam, M Khalili, B Naderi Soft Computing 13 (10), 995, 2009 | 58 | 2009 |
Optimization of rewards in single machine scheduling in the rewards-driven systems A Gharaei, B Naderi, M Mohammadi Management Science Letters 5 (6), 629-638, 2015 | 57 | 2015 |
Modeling and solving the project selection and scheduling AA Tofighian, B Naderi Computers & Industrial Engineering 83, 30-38, 2015 | 56 | 2015 |
Hybrid flexible flowshop problems: Models and solution methods B Naderi, S Gohari, M Yazdani Applied Mathematical Modelling 38 (24), 5767-5780, 2014 | 54 | 2014 |