Follow
Marcello Urgo
Marcello Urgo
Verified email at polimi.it - Homepage
Title
Cited by
Cited by
Year
A virtual factory approach for in situ simulation to support production and maintenance planning
W Terkaj, T Tolio, M Urgo
CIRP Annals 64 (1), 451-454, 2015
1302015
Virtual factory: An integrated framework for manufacturing systems design and analysis
T Tolio, M Sacco, W Terkaj, M Urgo
Procedia CIRP 7, 25-30, 2013
1232013
A project scheduling approach to production planning with feeding precedence relations
A Alfieri, T Tolio, M Urgo
International Journal of Production Research 49 (4), 995-1020, 2011
842011
A two-stage stochastic programming project scheduling approach to production planning
A Alfieri, T Tolio, M Urgo
The International Journal of Advanced Manufacturing Technology 62, 279-290, 2012
782012
Robust production control against propagation of disruptions
T Tolio, M Urgo, J Váncza
CIRP annals 60 (1), 489-492, 2011
572011
Ontology-based modeling of production systems for design and performance evaluation
W Terkaj, M Urgo
2014 12th IEEE International Conference on Industrial Informatics (INDIN …, 2014
562014
A path planning algorithm for industrial processes under velocity constraints with an application to additive manufacturing
H Giberti, L Sbaglia, M Urgo
Journal of Manufacturing Systems 43, 160-167, 2017
542017
A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty
T Tolio, M Urgo
CIRP annals 56 (1), 487-490, 2007
522007
Integrated virtual platform for manufacturing systems design
M Colledani, G Pedrielli, W Terkaj, M Urgo
Procedia CIRP 7, 425-430, 2013
452013
Design of flexible transfer lines: A case-based reconfiguration cost assessment
T Tolio, M Urgo
Journal of Manufacturing Systems 32 (2), 325-334, 2013
442013
A project scheduling approach to production and material requirement planning in Manufacturing-to-Order environments
A Alfieri, T Tolio, M Urgo
Journal of Intelligent Manufacturing 23, 575-585, 2012
442012
Co-definition of product structure and production network for frugal innovation perspectives: towards a modular-based approach
F Belkadi, J Buergin, RK Gupta, Y Zhang, A Bernard, G Lanza, ...
Procedia Cirp 50, 589-594, 2016
412016
A virtual factory data model as a support tool for the simulation of manufacturing systems
W Terkaj, M Urgo
Procedia CIRP 28, 137-142, 2015
402015
Virtual factory data model to support performance evaluation of production systems
W Terkaj, M Urgo
CEUR workshop proceedings 886 (2012), 44-58, 2012
402012
Design and management of reconfigurable assembly lines in the automotive industry
M Colledani, D Gyulai, L Monostori, M Urgo, J Unglert, F Van Houten
CIRP Annals 65 (1), 441-446, 2016
392016
Design of serious games in engineering education: An application to the configuration and analysis of manufacturing systems
M Urgo, W Terkaj, M Mondellini, G Colombo
CIRP Journal of Manufacturing Science and Technology 36, 172-184, 2022
372022
A digital factory platform for the design of roll shop plants
W Terkaj, P Gaboardi, C Trevisan, T Tolio, M Urgo
CIRP Journal of Manufacturing Science and Technology 26, 88-93, 2019
372019
An integrated framework for design, management and operation of reconfigurable assembly systems
M Manzini, J Unglert, D Gyulai, M Colledani, JM Jauregui-Becker, ...
Omega 78, 69-84, 2018
352018
A human modelling and monitoring approach to support the execution of manufacturing operations
M Urgo, M Tarabini, T Tolio
CIRP Annals 68 (1), 5-8, 2019
302019
A risk management-based evaluation of inventory allocations for make-to-order production
AM Radke, T Tolio, MM Tseng, M Urgo
CIRP Annals 62 (1), 459-462, 2013
262013
The system can't perform the operation now. Try again later.
Articles 1–20