Segui
Asiye Aydilek
Asiye Aydilek
Associate Professor of Economics
Email verificata su gust.edu.kw
Titolo
Citata da
Citata da
Anno
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
A Allahverdi, H Aydilek, A Aydilek
European Journal of Operational Research 269 (2), 590-601, 2018
682018
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
A Allahverdi, H Aydilek, A Aydilek
Computers & Operations Research 51, 200-207, 2014
452014
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 53 (9), 2803-2819, 2015
442015
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
A Allahverdi, H Aydilek, A Aydilek
Applied Mathematics and Computation 365, 124688, 2020
432020
Increasing the profitability and competitiveness in a production environment with random and bounded setup times
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 51 (1), 106-117, 2013
352013
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
A Aydilek, H Aydilek, A Allahverdi
Applied mathematical modelling 45, 982-996, 2017
312017
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
A Allahverdi, H Aydilek, A Aydilek
Applied mathematical modelling 40 (17-18), 7796-7815, 2016
312016
Types of banking institutions and economic growth
K Elmawazini, KA Khiyar, A Aydilek
International Journal of Islamic and Middle Eastern Finance and Management …, 2020
192020
Minimising maximum tardiness in assembly flowshops with setup times
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 55 (24), 7541-7565, 2017
192017
Minimizing the number of tardy jobs on a two-stage assembly flowshop
A Allahverdi, A Aydilek, H Aydilek
Journal of Industrial and Production Engineering 33 (6), 391-403, 2016
142016
Habit formation and housing over the life cycle
A Aydilek
Economic Modelling 33, 858-866, 2013
112013
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
H Aydilek, A Aydilek, M Allahverdi, A Allahverdi
International Journal of Industrial Engineering Computations 13 (4), 2022
102022
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure
M Allahverdi, H Aydilek, A Aydilek, A Allahverdi
Journal of Industrial & Management Optimization 17 (4), 1973-1991, 2021
82021
An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
A Allahverdi, H Aydilek, A Aydilek
International Journal of Industrial Engineering Computations 13 (1), 43-50, 2022
52022
An optimization model of retiree decisions under recursive utility with housing
A Aydilek, H Aydilek
Journal of Economics and Finance 44 (2), 258-277, 2020
52020
Do we really need heterogeneous agent models?
H Aydilek, A Aydilek
The Quarterly Review of Economics and Finance 78, 147-153, 2020
42020
The allocation of time and puzzling profiles of the elderly
A Aydilek
Economic Modelling 53, 515-526, 2016
42016
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
H Aydilek, A Aydilek, A Allahverdi
Engineering Optimization 53 (8), 1417-1430, 2021
32021
Insider trading with product differentiation
W Daher, H Aydilek, F Karam, A Aydilek
Journal of Economics 111 (2), 173-201, 2014
32014
Parameter interchangeability under recursive utility with housing
A Aydilek, H Aydilek
Journal of Economics and Finance 42, 807-817, 2018
22018
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20