Cyril Briand
Cyril Briand
LAAS-CNRS - UPS
Email verificata su laas.fr - Home page
Titolo
Citata da
Citata da
Anno
A robust approach for the single machine scheduling problem
C Briand, HT La, J Erschler
Journal of Scheduling 10 (3), 209-221, 2007
362007
Nash equilibria for the multi-agent project scheduling problem with controllable processing times
A Agnetis, C Briand, JC Billaut, P ŠůCha
Journal of Scheduling 18 (1), 15-27, 2015
262015
A new sufficient condition of optimality for the two-machine flowshop problem
C Briand, HT La, J Erschler
European Journal of Operational Research 169 (3), 712-722, 2006
212006
Utilisation d'ordres partiels pour la caractérisation de solution robustes en ordonnancement
HT La
INSA de Toulouse, 2005
192005
Scheduling with time lags and preferences: a heuristic
C Briand, E Despontin, F Roubellat
8th workshop on Project Management and Scheduling, Valencia, 3-5, 2002
192002
Fast HOG based person detection devoted to a mobile robot with a spherical camera
AA Mekonnen, C Briand, F Lerasle, A Herbulot
2013 IEEE/RSJ International Conference on Intelligent Robots and Systems …, 2013
162013
The truck scheduling problem at cross-docking terminals
L Berghman, C Briand, R Leus, P Lopez
Proceedings of the 13th International Conference on Project Management and …, 2012
132012
An efficient ILP formulation for the single machine scheduling problem
C Briand, S Ourari, B Bouzouia
RAIRO-Operations Research 44 (1), 61-71, 2010
122010
People detection with heterogeneous features and explicit optimization on computation time
AA Mekonnen, F Lerasle, A Herbulot, C Briand
2014 22nd International Conference on Pattern Recognition, 4322-4327, 2014
102014
De l'ordonnancement déterministe à l'ordannancement distribué sous incertitudes
S Ourari
92011
Approches par contraintes pour l’ordonnancement robuste
C Briand, MJ Huguet, HT La, P Lopez
Flexibilité et Robustesse en Ordonnancement sous la direction de JC. Billaut …, 2004
92004
Pilotage d'atelier basé sur un ordonnancement flexible
C Artigues, C Briand, MC Portmann, F Roubellat
92002
Fast minimum float computation in activity networks under interval uncertainty
T Garaix, C Artigues, C Briand
Journal of Scheduling 16 (1), 93-103, 2013
82013
The resource-constrained activity insertion problem with minimum and maximum time lags
C Artigues, C Briand
Journal of Scheduling 12 (5), 447-460, 2009
82009
The multiagent project scheduling problem: complexity of finding an optimal Nash equilibrium
C Briand, A Agnetis, JC Billaut
Proceedings of PMS conference, 106-109, 2012
72012
Cooperative project scheduling with controllable processing times: a game theory framework
C Briand, JC Billaut
ETFA2011, 1-7, 2011
62011
A new any-order schedule generation scheme for resource-constrained project scheduling
C Briand
RAIRO-Operations Research 43 (3), 297-308, 2009
62009
Aide à la décision pour une coopération interentreprise
E MONSARRAT, C BRIAND, P ESQUIROL
Journal européen des systèmes automatisés 39 (7), 799-818, 2005
62005
Une approche pour l'ordonnancement robuste de tâches sur une machine
C Briand, HT La, J Erschler
4ème Conférence Francophone de MOdélisation et SIMulation (MOSIM'03), 205, 0
6
Finding an optimal Nash equilibrium to the multi-agent project scheduling problem
C Briand, SU Ngueveu, P Šůcha
Journal of Scheduling 20 (5), 475-491, 2017
52017
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20