Follow
Gholamreza Heravi
Gholamreza Heravi
Professor, Construction Engineering and Management, University of Tehran, Iran Ph.D., P.E., M.ASCE
Verified email at ut.ac.ir - Homepage
Title
Cited by
Cited by
Year
The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran
AA Ahmadabadi, G Heravi
Transport policy 73, 152-161, 2019
1762019
Applying artificial neural networks for measuring and predicting construction-labor productivity
G Heravi, E Eslamdoost
Journal of Construction Engineering and Management 141 (10), 04015032, 2015
1722015
Risk allocation in public–private partnership infrastructure projects in developing countries: case study of the Tehran–Chalus toll road
G Heravi, Z Hajihosseini
Journal of Infrastructure Systems 18 (3), 210-217, 2012
1372012
Evaluation of sustainability indicators of industrial buildings focused on petrochemical projects
G Heravi, M Fathi, S Faeghi
Journal of Cleaner Production 109, 92-107, 2015
1172015
Multi-criteria group decision-making method for optimal selection of sustainable industrial building options focused on petrochemical projects
G Heravi, M Fathi, S Faeghi
Journal of Cleaner Production 142, 2999-3013, 2017
992017
Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success
AA Ahmadabadi, G Heravi
Transportation research part a: policy and practice 124, 169-188, 2019
792019
Development of a comprehensive model for construction project success evaluation by contractors
G Heravi, M Ilbeigi
Engineering, Construction and Architectural Management 19 (5), 526-542, 2012
772012
Integrating life-cycle assessment and life-cycle cost analysis to select sustainable pavement: A probabilistic model using managerial flexibilities
MR Heidari, G Heravi, AN Esmaeeli
Journal of Cleaner Production 254, 120046, 2020
762020
Production process improvement of buildings’ prefabricated steel frames using value stream mapping
G Heravi, M Firoozi
The International Journal of Advanced Manufacturing Technology 89, 3307-3321, 2017
722017
Evaluation of energy consumption during production and construction of concrete and steel frames of residential buildings
G Heravi, T Nafisi, R Mousavi
Energy and Buildings 130, 244-252, 2016
702016
Energy consumption and carbon emissions assessment of integrated production and erection of buildings’ pre-fabricated steel frames using lean techniques
G Heravi, M Rostami, MF Kebria
Journal of cleaner production 253, 120045, 2020
632020
Cost of quality evaluation in mass-housing projects in developing countries
G Heravi, A Jafari
Journal of Construction Engineering and Management 140 (5), 04014004, 2014
622014
Energy performance of buildings: The evaluation of design and construction measures concerning building energy efficiency in Iran
G Heravi, M Qaemi
Energy and Buildings 75, 456-464, 2014
612014
Investigating cost overruns and delay in urban construction projects in Iran
G Heravi, M Mohammadian
International Journal of Construction Management 21 (9), 958-968, 2021
552021
Group decision making for stochastic optimization of time, cost, and quality in construction projects
G Heravi, S Faeghi
Journal of Computing in Civil Engineering 28 (2), 275-283, 2014
542014
Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management
G Heravi, MF Kebria, M Rostami
Engineering, Construction and Architectural Management 28 (1), 174-195, 2021
432021
The influence of project risk management maturity and organizational learning on the success of power plant construction projects
G Heravi, A Gholami
Project Management Journal 49 (5), 22-37, 2018
402018
Assessment of water consumption during production of material and construction phases of residential building projects
G Heravi, MM Abdolvand
Sustainable Cities and Society 51, 101785, 2019
392019
Optimizing the owner’s scenarios for budget allocation in a portfolio of projects using agent-based simulation
MM Farshchian, G Heravi, S AbouRizk
Journal of Construction Engineering and Management 143 (7), 04017022, 2017
302017
Predicting change by evaluating the change implementation process in construction projects using event tree analysis
G Heravi, MH Charkhakan
Journal of Management in Engineering 31 (5), 04014081, 2015
302015
The system can't perform the operation now. Try again later.
Articles 1–20