Kumares Sinha
Title
Cited by
Cited by
Year
Transportation decision making: Principles of project evaluation and programming
KC Sinha, S Labi
John Wiley & Sons, 2011
4662011
Bridge performance prediction model using the Markov chain
Y Jiang, M Saito, KC Sinha
Transportation Research Record, 1988
2381988
An analysis of cost overruns and time delays of INDOT projects
C Bordat, BG McCullouch, S Labi, KC Sinha
Joint Transportation Research Program, 2004
1512004
Bridge service life prediction model using the Markov chain
Y Jiang, KC Sinha
Transportation research record 1223 (1), 24-30, 1989
1361989
Sustainability and urban public transportation
KC Sinha
Journal of Transportation Engineering 129 (4), 331-341, 2003
1292003
Annual average daily traffic prediction model for county roads
D Mohamad, KC Sinha, T Kuczek, CF Scholer
Transportation research record 1617 (1), 69-77, 1998
1251998
Life-cycle evaluation of flexible pavement preventive maintenance
S Labi, KC Sinha
Journal of transportation engineering 131 (10), 744-751, 2005
1232005
Modeling bus delays due to passenger boardings and alightings
RP Guenthner, KC Sinha
Transportation Research Record, 1983
1141983
Life cycle cost analysis for INDOT pavement design procedures
G Lamptey, MZ Ahmad, S Labi, KC Sinha
Joint Transportation Research Program, 2005
1112005
ITS impacts on safety and traffic management: an investigation of secondary crash causes
MG Karlaftis, SP Latoski, NJ Richards, KC Sinha
Journal of Intelligent Transportation Systems 5 (1), 39-52, 1999
1091999
Measures of short-term effectiveness of highway pavement maintenance
S Labi, KC Sinha
Journal of Transportation Engineering 129 (6), 673-683, 2003
1032003
Three-stage least-squares analysis of time and cost overruns in construction contracts
A Bhargava, PC Anastasopoulos, S Labi, KC Sinha, FL Mannering
Journal of construction engineering and management 136 (11), 1207-1218, 2010
1022010
Application of dynamic programming and other mathematical techniques to pavement management systems
KJ Feighan, MY Shahin, KC Sinha, TD White
Transportation Research Record, 1988
971988
Methodology for multicriteria decision making in highway asset management
Z Li, KC Sinha
Transportation Research Record 1885 (1), 79-87, 2004
792004
Highway routine maintenance programming at network level
TF Fwa, KC Sinha, JDN Riverson
Journal of Transportation Engineering 114 (5), 539-554, 1988
791988
Cost savings analysis of performance-based contracts for highway maintenance operations
PC Anastasopoulos, BG McCullouch, K Gkritza, FL Mannering, KC Sinha
Journal of Infrastructure Systems 16 (4), 251-263, 2010
772010
Effectiveness of highway pavement seal coating treatments
S Labi, KC Sinha
Journal of transportation engineering 130 (1), 14-23, 2004
762004
Analysis of crash rates at interstate work zones in Indiana
R Pal, KC Sinha
Transportation Research Record 1529 (1), 43-53, 1996
731996
Cost-effectiveness evaluation of Hoosier Helper freeway service patrol
SP Latoski, R Pal, KC Sinha
Journal of Transportation Engineering 125 (5), 429-438, 1999
721999
A dynamic programming approach to optimization for pavement management systems
KJ Feighan, MY Shahin, KC Sinha
2nd North American Pavement Management Conference, 2.195-2.206, 1987
711987
The system can't perform the operation now. Try again later.
Articles 1–20