Sophie Demassey
TitleCited byYear
Resource-constrained project scheduling
C Artigues, S Demassey, E Neron
ISTE/Wiley, 2008
216*2008
Global constraint catalogue: Past, present and future
N Beldiceanu, M Carlsson, S Demassey, T Petit
Constraints 12 (1), 21-62, 2007
142*2007
A cost-regular based hybrid column generation approach
S Demassey, G Pesant, LM Rousseau
Constraints 11 (4), 315-333, 2006
1282006
Constraint-propagation-based cutting planes: An application to the resource-constrained project scheduling problem
S Demassey, C Artigues, P Michelon
INFORMS Journal on computing 17 (1), 52-65, 2005
1032005
Bin repacking scheduling in virtualized datacenters
F Hermenier, S Demassey, X Lorca
17th International Conference on Principles and Practice of Constraint …, 2011
712011
Tight LP bounds for resource constrained project scheduling
P Baptiste, S Demassey
OR Spectrum 26 (2), 251-262, 2004
702004
New filtering for the cumulative constraint in the context of non-overlapping rectangles
N Beldiceanu, M Carlsson, S Demassey, E Poder
Annals of Operations Research 184 (1), 27-50, 2011
50*2011
Sequencing and Counting with the MultiCost-Regular Constraint
J Menana, S Demassey
6th International Conference on Integration of AI and OR Techniques in …, 2009
482009
Constraint programming based column generation for employee timetabling
S Demassey, G Pesant, LM Rousseau
2nd International Conference on Integration of AI and OR techniques in …, 2005
452005
A convex mathematical program for pump scheduling in a class of branched water networks
G Bonvin, S Demassey, C Le Pape, N Maïzi, V Mazauric, A Samperio
Applied Energy 185, 1702-1711, 2017
432017
Méthodes hybrides de programmation par contraintes et programmation linéaire pour le probleme d’ordonnancement de projeta contraintes de ressources
S Demassey
PhD Thesis - Université d’Avignon et des Pays de Vaucluse, 2003
162003
A hybrid constraint propagation-based cutting plane algorithm for the rcpsp
S Demassey, C Artigues, P Michelon
4th International Workshop on Integration of AI and OR techniques in …, 2002
13*2002
Graph properties based filtering
N Beldiceanu, M Carlsson, S Demassey, T Petit
12th International Conference on Principles and Practice of Constraint …, 2006
112006
Mathematical programming formulations and lower bounds
S Demassey
Resource‐Constrained Project Scheduling, 49-62, 2008
10*2008
A heuristic approach to the water networks pumping scheduling issue
G Bonvin, A Samperio, C Le Pape, V Mazauric, S Demassey, N Maïzi
Energy Procedia 75, 2846-2851, 2015
82015
Lower bounds for resource constrained project scheduling problem
E Neron, C Artigues, P Baptiste, J Carlier, J Damay, S Demassey, ...
Perspectives in modern project scheduling, 167-204, 2006
82006
An improved upper bound for the railway infrastructure capacity problem on the pierrefitte-gonesse junction
A Merel, X Gandibleux, S Demassey, R Lusby
10ème congrès de la Société Française de Recherche Opérationnelle et d’Aide …, 2009
72009
A collaborative combination between column generation and ant colony optimization for solving set packing problems
A Merel, X Gandibleux, S Demassey
9th Metaheuristics International Conference (MIC 2011), 2011
62011
Integration of AI and OR techniques in constraint programming for combinatorial optimization problems
R Barták, M Milano
Springer Berlin/Heidelberg., 2005
62005
An application of resolution search to the RCPSP
S Demassey, C Artigues, P Michelon
17th European Conference on Combinatorial Optimization (ECCO 2004), 2004
62004
The system can't perform the operation now. Try again later.
Articles 1–20