Christian Artigues
Christian Artigues
Chargé de Recherche au LAAS-CNRS, Toulouse
Verified email at laas.fr
TitleCited byYear
Insertion techniques for static and dynamic resource-constrained project scheduling
C Artigues, P Michelon, S Reusser
European Journal of Operational Research 149 (2), 249-267, 2003
2882003
The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF’2005 challenge problem
C Solnon, VD Cung, A Nguyen, C Artigues
European Journal of Operational Research 191 (3), 912-927, 2008
2142008
Resource-constrained project scheduling: models, algorithms, extensions and applications
C Artigues, S Demassey, E Neron
John Wiley & Sons, 2013
2012013
Event-based MILP models for resource-constrained project scheduling problems
O Koné, C Artigues, P Lopez, M Mongeau
Computers & Operations Research 38 (1), 3-13, 2011
1922011
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
C Artigues, F Roubellat
European Journal of Operational Research 127 (2), 297-316, 2000
1512000
LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
M Palpant, C Artigues, P Michelon
Annals of Operations Research 131 (1-4), 237-257, 2004
1482004
A memetic algorithm with a large neighborhood crossover operator for the generalized traveling salesman problem
B Bontoux, C Artigues, D Feillet
Computers & Operations Research 37 (11), 1844-1852, 2010
1072010
Maximization of solution flexibility for robust shop scheduling
C Artigues, JC Billaut, C Esswein
European Journal of Operational Research 165 (2), 314-328, 2005
1002005
Constraint-propagation-based cutting planes: An application to the resource-constrained project scheduling problem
S Demassey, C Artigues, P Michelon
INFORMS Journal on computing 17 (1), 52-65, 2005
1002005
Vehicle routing problems with alternative paths: An application to on-demand transportation
T Garaix, C Artigues, D Feillet, D Josselin
European Journal of Operational Research 204 (1), 62-75, 2010
962010
Robust optimization for resource-constrained project scheduling with uncertain activity durations
C Artigues, R Leus, FT Nobibon
Flexible Services and Manufacturing Journal 25 (1-2), 175-205, 2013
942013
A branch and bound method for the job-shop problem with sequence-dependent setup times
C Artigues, D Feillet
Annals of Operations Research 159 (1), 135-159, 2008
932008
The energy scheduling problem: Industrial case-study and constraint propagation techniques
C Artigues, P Lopez, A Hait
International Journal of Production Economics 143 (1), 13-23, 2013
822013
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
C Artigues, P Lopez, PD Ayache
Annals of Operations Research 138 (1), 21-52, 2005
762005
Parallel machine scheduling with precedence constraints and setup times
B Gacias, C Artigues, P Lopez
Computers & Operations Research 37 (12), 2141-2151, 2010
652010
Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound
C Artigues, M Gendreau, LM Rousseau, A Vergnaud
Computers & Operations Research 36 (8), 2330-2340, 2009
652009
Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources
O Koné, C Artigues, P Lopez, M Mongeau
Flexible Services and Manufacturing Journal 25 (1-2), 25-47, 2013
532013
A batching and scheduling algorithm for the diffusion area in semiconductor manufacturing
C Yugma, S Dauzère-Pérès, C Artigues, A Derreumaux, O Sibille
International Journal of Production Research 50 (8), 2118-2132, 2012
472012
On electrical load tracking scheduling for a steel plant
A Hait, C Artigues
Computers & Chemical Engineering 35 (12), 3044-3047, 2011
452011
An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times
C Artigues, O Roubellat
Production Planning & Control 13 (2), 175-186, 2002
412002
The system can't perform the operation now. Try again later.
Articles 1–20