Follow
Oriol Nomen
Title
Cited by
Cited by
Year
Validation of the linear IFMIF prototype accelerator (LIPAc) in Rokkasho
K Kondo, T Akagi, F Arranz, N Bazin, L Bellan, B Bolzon, B Branas, ...
Fusion Engineering and Design 153, 111503, 2020
252020
The LIPAc beam dump
B Brañas, F Arranz, O Nomen, D Iglesias, F Ogando, M Parro, ...
Fusion Engineering and Design 127, 127-138, 2018
222018
Preliminary design of the HEBT of IFMIF DONES
O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ...
Fusion Engineering and Design 153, 111515, 2020
202020
Detailed mechanical design of the LIPAc beam dump radiological shielding
O Nomen, JI Martínez, F Arranz, D Iglesias, G Barrera, B Brañas, ...
Fusion Engineering and Design 88 (9-10), 2723-2727, 2013
142013
The accelerator system of IFMIF-DONES multi-MW facility
I Podadera, A Ibarra, D Jiménez-Rey, J Molla, C de la Morena, C Oliver, ...
Proc. IPAC’21, 1910-1913, 2021
132021
Manufacturing, assembly and tests of the LIPAc medium energy beam transport line (MEBT)
I Podadera, P Abramian, B Brañas, J Calero, J Castellanos, JM García, ...
Proc. 28th Linear Accelerator Conf.(LINAC’16), 554-557, 2016
132016
Lead shutter for the IFMIF LIPAc accelerator
O Nomen, B Brañas, F Ogando, F Arranz, P Sauvan, J Castellanos
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2018
122018
Beam diagnostics for the multi-MW high energy beam transport line of DONES
I Podadera, A Ibarra, D Jiménez-Rey, J Mollá, C Oliver, R Varela, ...
Proc. 8th Int. Beam Instrumentation Conf.(IBIC’19), 200-204, 2019
92019
Design of the HEBT components inside TIR room of the IFMIF DONES facility
D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela
Fusion Engineering and Design 168, 112636, 2021
82021
Remote handling in the accelerator systems of DONES
F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ...
IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020
82020
Remote disconnection system for the beam dump of the LIPAc accelerator
F Arranz, O Nomen, B Brañas, J Castellanos, J Molla, D Gutierrez
Fusion Engineering and Design 125, 123-126, 2017
82017
Manufacturing prototypes for LIPAC beam dump
F Arranz, B Brañas, D Iglesias, O Nomen, D Rapisarda, J Lapeña, ...
Fusion Engineering and Design 89 (9-10), 2199-2203, 2014
82014
Present status of the liquid breeder validation module for IFMIF
N Casal, A Mas, F Mota, Á García, D Rapisarda, O Nomen, JM Arroyo, ...
Fusion Engineering and Design 88 (6-8), 863-867, 2013
82013
Status of the engineering design of the IFMIF-DONES high energy beam transport line and beam dump system
D Sánchez-Herranz, O Nomen, M Sanmartí, BK Singh, F Arranz, ...
Journal of Physics: Conference Series 2420 (1), 012080, 2023
72023
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT line
C Oliver, A Ibarra, J Molla, I Podadera, R Varela, H Dzitko, O Nomen, ...
Proc. IPAC’21, 3251-3253, 2021
72021
Design, manufacturing and tests of the LIPAc high energy beam transport line
B Brañas, J Castellanos, O Nomen, C Oliver, F Aragón, F Arranz, ...
Nuclear Fusion 61 (1), 015001, 2020
72020
Commissioning of the LIPAc medium energy beam transport line
I Podadera, P Cara, J Castellanos, T Ebisawa, JM García, D Gavela, ...
9th Int. Particle Accelerator Conf.(IPAC'18), Vancouver, BC, Canada, April …, 2018
72018
Overview of the validation activities of IFMIF/EVEDA: LIPAc, the linear IFMIF prototype accelerator and lifus 6, the lithium corrosion induced facility
M Sugimoto, P CARA, A KASUGAI, K SAKAMOTO, T AKAGI, T EBISAWA, ...
27th IAEA Fusion Energy Conference, Gandhinagar, India, 2018
52018
Engineering issues of the medium energy beam transport line and srf linac for the LIPAc
N Bazin, G Devanz, P Hardy
52016
Design and configurations for the Shielding of the Beam Dump of IFMIF DONES
D Sanchez-Herranz, P Ortego, O Nomen, B Branas, F Ogando, P Sauvan, ...
Fusion Engineering and Design 153, 111475, 2020
42020
The system can't perform the operation now. Try again later.
Articles 1–20