Validation of the linear IFMIF prototype accelerator (LIPAc) in Rokkasho K Kondo, T Akagi, F Arranz, N Bazin, L Bellan, B Bolzon, B Branas, ... Fusion Engineering and Design 153, 111503, 2020 | 25 | 2020 |
The LIPAc beam dump B Brañas, F Arranz, O Nomen, D Iglesias, F Ogando, M Parro, ... Fusion Engineering and Design 127, 127-138, 2018 | 22 | 2018 |
Preliminary design of the HEBT of IFMIF DONES O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ... Fusion Engineering and Design 153, 111515, 2020 | 20 | 2020 |
Detailed mechanical design of the LIPAc beam dump radiological shielding O Nomen, JI Martínez, F Arranz, D Iglesias, G Barrera, B Brañas, ... Fusion Engineering and Design 88 (9-10), 2723-2727, 2013 | 14 | 2013 |
The accelerator system of IFMIF-DONES multi-MW facility I Podadera, A Ibarra, D Jiménez-Rey, J Molla, C de la Morena, C Oliver, ... Proc. IPAC’21, 1910-1913, 2021 | 13 | 2021 |
Manufacturing, assembly and tests of the LIPAc medium energy beam transport line (MEBT) I Podadera, P Abramian, B Brañas, J Calero, J Castellanos, JM García, ... Proc. 28th Linear Accelerator Conf.(LINAC’16), 554-557, 2016 | 13 | 2016 |
Lead shutter for the IFMIF LIPAc accelerator O Nomen, B Brañas, F Ogando, F Arranz, P Sauvan, J Castellanos Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2018 | 12 | 2018 |
Beam diagnostics for the multi-MW high energy beam transport line of DONES I Podadera, A Ibarra, D Jiménez-Rey, J Mollá, C Oliver, R Varela, ... Proc. 8th Int. Beam Instrumentation Conf.(IBIC’19), 200-204, 2019 | 9 | 2019 |
Design of the HEBT components inside TIR room of the IFMIF DONES facility D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela Fusion Engineering and Design 168, 112636, 2021 | 8 | 2021 |
Remote handling in the accelerator systems of DONES F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ... IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020 | 8 | 2020 |
Remote disconnection system for the beam dump of the LIPAc accelerator F Arranz, O Nomen, B Brañas, J Castellanos, J Molla, D Gutierrez Fusion Engineering and Design 125, 123-126, 2017 | 8 | 2017 |
Manufacturing prototypes for LIPAC beam dump F Arranz, B Brañas, D Iglesias, O Nomen, D Rapisarda, J Lapeña, ... Fusion Engineering and Design 89 (9-10), 2199-2203, 2014 | 8 | 2014 |
Present status of the liquid breeder validation module for IFMIF N Casal, A Mas, F Mota, Á García, D Rapisarda, O Nomen, JM Arroyo, ... Fusion Engineering and Design 88 (6-8), 863-867, 2013 | 8 | 2013 |
Status of the engineering design of the IFMIF-DONES high energy beam transport line and beam dump system D Sánchez-Herranz, O Nomen, M Sanmartí, BK Singh, F Arranz, ... Journal of Physics: Conference Series 2420 (1), 012080, 2023 | 7 | 2023 |
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT line C Oliver, A Ibarra, J Molla, I Podadera, R Varela, H Dzitko, O Nomen, ... Proc. IPAC’21, 3251-3253, 2021 | 7 | 2021 |
Design, manufacturing and tests of the LIPAc high energy beam transport line B Brañas, J Castellanos, O Nomen, C Oliver, F Aragón, F Arranz, ... Nuclear Fusion 61 (1), 015001, 2020 | 7 | 2020 |
Commissioning of the LIPAc medium energy beam transport line I Podadera, P Cara, J Castellanos, T Ebisawa, JM García, D Gavela, ... 9th Int. Particle Accelerator Conf.(IPAC'18), Vancouver, BC, Canada, April …, 2018 | 7 | 2018 |
Overview of the validation activities of IFMIF/EVEDA: LIPAc, the linear IFMIF prototype accelerator and lifus 6, the lithium corrosion induced facility M Sugimoto, P CARA, A KASUGAI, K SAKAMOTO, T AKAGI, T EBISAWA, ... 27th IAEA Fusion Energy Conference, Gandhinagar, India, 2018 | 5 | 2018 |
Engineering issues of the medium energy beam transport line and srf linac for the LIPAc N Bazin, G Devanz, P Hardy | 5 | 2016 |
Design and configurations for the Shielding of the Beam Dump of IFMIF DONES D Sanchez-Herranz, P Ortego, O Nomen, B Branas, F Ogando, P Sauvan, ... Fusion Engineering and Design 153, 111475, 2020 | 4 | 2020 |