Follow
Taha Ashoori
Taha Ashoori
Ph.D., P.E., Geotechnical Project Engineer/Manager, Tetra Tech
Verified email at mavs.uta.edu
Title
Cited by
Cited by
Year
Sewer pipes condition prediction models: A state-of-the-art review
M Malek Mohammadi, M Najafi, V Kaushal, R Serajiantehrani, ...
Infrastructures 4 (4), 64, 2019
552019
Integrating underground freight transportation into existing intermodal systems
M Najafi, S Ardekani, SM Shahandashti
262016
Comparison of carbon footprint of trenchless and open-cut methods for underground freight transportation
R Tavakoli, M Najafi, A Tabesh, T Ashoori
Pipelines 2017, 45-55, 2017
202017
Environmental impacts of pipeline construction for underground freight transportation
A Tabesh, M Najafi, T Ashoori, R Tavakoli, SM Shahandashti
Pipelines 2017, 181-191, 2017
142017
Comparison of construction methods for underground freight transportation in Texas
A Tabesh, M Najafi, SJ Korky, T Ashoori, N Rezaei
Pipelines 2016, 817-826, 2016
122016
Use of cut-and-cover method for pipeline installation in underground freight transportation
T Ashoori, M Najafi, A Tabesh, SMS Jalalediny Korky, MM Mohammadi
Pipelines 2017, 64-74, 2017
82017
Comparison of trenchless and open-cut methods for construction of an underground freight transportation system
A Tabesh, M Najafi, SJ Korky, T Ashoori, N Rezaei
Proceeding of, 2016
82016
Dynamic response of different types of shallow foundation over sandy soils to horizontal harmonic loading
T Ashoori, K Pakiman
International Journal of Geotechnical Earthquake Engineering (IJGEE) 6 (1), 1-14, 2015
62015
Identification and evaluation of criteria for selecting contractors using a risk management approach
E Mousakhani, S Ranjbar, T Ashoori
Organization, technology & management in construction: an international …, 2018
52018
Risk Identification for Pipeline Installation by Horizontal Directional Drilling (HDD)
A Tabesh, M Najafi, Z Kohankar, MM Mohammadi, T Ashoori
Pipelines 2019, 141-150, 2019
42019
An Analysis of Soil Hauling Operations for Tunneling and Pipeline Installation
S Jalalediny Korky, M Najafi, M MalekMohammadi, T Ashoori, A Tabesh
Pipelines 2017, 38-44, 2017
42017
COMPARISON OF GROUND MOVEMENTS DURING TRENCHLESS TECHNOLOGY OPERATIONS FOR PIPE AND BOX INSTALLATIONS BY NUMERICAL ANALYSIS
T Ashoori
22018
Microtunneling in Tehran Metropolis
K Pakiman, P Sanjari, T Ashoori
International Society for Trenchless Technology, 2014
22014
Surface Settlement at Intersection of Tunnels using by 3-D Numerical Analysis: Case Study
TA Hamid Ghasempour, Ehsan Mousakhani
Journal of Geotechnical and Transportation Engineering 4 (2), 57-62, 2018
2018
Identification and evaluation of criteria for selecting contractors using a risk management approach
TA Ehsan Mousakhani, Shirzad Ranjbar
2018
COMPARISON OF GROUND MOVEMENTS DURING TRENCHLESS TECHNOLOGY
T ASHOORI
UNIVERSITY OF TEXAS AT ARLINGTON, 2018
2018
CHALLENGES FOR SHAFT EXCAVATION DURING A MICROTUNNELING PROJECT IN URBAN ENVIRONMENT
BA Keivan Pakiman, Taha Ashoori, Mohammad Najafi, Amir Tabesh
ISTT, 2015
2015
Microtunneling Challenges in Urban Environment
K Pakiman, T Ashoori, M Najafi, A Tabesh, B Abediniangerabi
International Society for Trenchless Technology (ISTT), 2015
2015
The positive impact of the transfer of Project Management to Strategic Project Management and role of star managers in this transfer
TA Mohammad Hasan Sebt, Ehsan Mousakhani, Shahin Amiri
Advances in Environmental Biology, 1324-1330, 2014
2014
Risk and Claim Management with Treaty Respects in Construction Contracts
TA Eghbal Shakeri, Ehsan Mousakhani, Shahin Amiri
MAGNT Research Report 2, 4098-4106, 2014
2014
The system can't perform the operation now. Try again later.
Articles 1–20