John Fowler
Title
Cited by
Cited by
Year
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
JK Cochran, SM Horng, JW Fowler
Computers & Operations Research 30 (7), 1087-1102, 2003
3022003
Grand challenges in modeling and simulation of complex manufacturing systems
JW Fowler, O Rose
Simulation 80 (9), 469-476, 2004
2972004
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzčre-Pérčs, SJ Mason, O Rose
Journal of scheduling 14 (6), 583-599, 2011
2932011
A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
SJ Mason, JW Fowler, W Matthew Carlyle
Journal of Scheduling 5 (3), 247-262, 2002
2412002
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Computers & Operations Research 32 (11), 2731-2750, 2005
2232005
Production planning and control for semiconductor wafer fabrication facilities: modeling, analysis, and systems
L Mönch, JW Fowler, SJ Mason
Springer Science & Business Media, 2012
1762012
A new scheduling approach using combined dispatching criteria in wafer fabs
RM Dabbas, JW Fowler
IEEE Transactions on semiconductor manufacturing 16 (3), 501-510, 2003
1722003
Measurement and improvement of manufacturing capacities (MIMAC): Final report
J Fowler, J Robinson
Technical Report 95062861A-TR, SEMATECH, Austin, TX, 1995
1611995
Real-time control of multiproduct bulk-service semiconductor manufacturing processes
JW Fowler, DT Phillips, GL Hogg
IEEE Transactions on Semiconductor Manufacturing 5 (2), 158-163, 1992
1581992
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
H Balasubramanian, L Mönch, J Fowler, M Pfund
International Journal of Production Research 42 (8), 1621-1638, 2004
1542004
Bi‐criteria scheduling of surgical services for an outpatient procedure center
S Gul, BT Denton, JW Fowler, T Huschka
Production and Operations management 20 (3), 406-417, 2011
1422011
Mixed integer programming formulations for single machine scheduling problems
AB Keha, K Khowala, JW Fowler
Computers & Industrial Engineering 56 (1), 357-367, 2009
1382009
Scheduling jobs on parallel machines with setup times and ready times
M Pfund, JW Fowler, A Gadkari, Y Chen
Computers & Industrial Engineering 54 (4), 764-782, 2008
1302008
Heuristics for workforce planning with worker differences
JW Fowler, P Wirojanagud, ES Gel
European Journal of Operational Research 190 (3), 724-740, 2008
1272008
Minimizing total weighted tardiness on a single batch process machine with incompatible job families
IC Perez, JW Fowler, WM Carlyle
Computers & Operations Research 32 (2), 327-341, 2005
1252005
The use of upstream and downstream information in scheduling semiconductor batch operations
JK Robinson, JW Fowler, JF Bard
International Journal of Production Research 33 (7), 1849-1869, 1995
1231995
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
L Mönch, R Schabacker, D Pabst, JW Fowler
European Journal of Operational Research 177 (3), 2100-2118, 2007
1202007
Workload control in the semiconductor industry
JW Fowler, GL Hogg, SJ Mason
Production Planning & Control 13 (7), 568-578, 2002
1192002
A combined dispatching criteria approach to scheduling semiconductor manufacturing systems
RM Dabbas, HN Chen, JW Fowler, D Shunk
Computers & industrial engineering 39 (3-4), 307-324, 2001
1092001
A hybrid approach using the analytic hierarchy process and integer programming to screen weapon systems projects
MA Greiner, JW Fowler, DL Shunk, WM Carlyle, RT McNutt
IEEE Transactions on Engineering management 50 (2), 192-203, 2003
1072003
The system can't perform the operation now. Try again later.
Articles 1–20