Riad Aggoune
Riad Aggoune
R&D Manager, CRP Henri Tudor - Luxembourg
Email verificata su tudor.lu
Titolo
Citata da
Citata da
Anno
Minimizing the makespan for the flow shop scheduling problem with availability constraints
R Aggoune
European Journal of Operational Research 153 (3), 534-543, 2004
1632004
Flow shop scheduling problem with limited machine availability: A heuristic approach
R Aggoune, MC Portmann
International Journal of Production Economics 99 (1-2), 4-15, 2006
722006
Exploring the determination of struvite solubility product from analytical results
MS Rahaman, DS Mavinic, MIH Bhuiyan, FA Koch
Environmental technology 27 (9), 951-961, 2006
59*2006
Characterisation of domestic hot water end-uses for integrated urban thermal energy assessment and optimisation
A Bertrand, A Mastrucci, N Schüler, R Aggoune, F Maréchal
Applied Energy 186, 152-166, 2017
362017
Ordonnancement d'ateliers sous contraintes de disponibilité des machines
R Aggoune
342002
A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
C Wolosewicz, S Dauzère-Pérès, R Aggoune
European Journal of Operational Research 244 (1), 3-12, 2015
302015
In-building waste water heat recovery: An urban-scale method for the characterisation of water streams and the assessment of energy savings and costs
A Bertrand, R Aggoune, F Maréchal
Applied Energy 192, 110-125, 2017
272017
Solving the integrated lot-sizing and job-shop scheduling problem
ED Gómez Urrutia, R Aggoune, S Dauzère-Pérès
International Journal of Production Research 52 (17), 5236-5254, 2014
182014
Genetic algorithms for the flow shop scheduling problem with availability constraints
R Aggoune, AH Mahdi, MC Portmann
2001 IEEE International Conference on Systems, Man and Cybernetics. e …, 2001
182001
CO2 emissions calculation models for green supply chain management
W Mtalaa, R Aggoune, J Schaefers
Proceedings of POMS 20th Annual Meeting, 2009
132009
A new approach for solving integrated planning and scheduling problem
C Wolosewicz, S Dauzère-Pérès, R Aggoune
IFAC Proceedings Volumes 39 (3), 191-196, 2006
132006
TOC-based planning and scheduling model
J Schaefers, R Aggoune, F Becker, R Fabbri
International journal of production research 42 (13), 2639-2649, 2004
132004
Disjunctive and time-indexed formulations for non-preemptive job shop scheduling with resource availability constraints
S Azem, R Aggoune, S Dauzère-Pérès
2007 IEEE international conference on industrial engineering and engineering …, 2007
112007
A contribution to performance measurement in the healthcare industry: the industrial point of view
J Schaefers, J Colin, R Aggoune, M Kucina
International Journal of Business Performance Management 9 (2), 226-239, 2007
82007
An optimization algorithm to schedule care for the elderly at home
W Aggoune-Mtalaa, R Aggoune
International Journal of Information Science and Intelligent System 3 (3), 41-50, 2014
72014
A solving procedure for a general integrated lot sizing and fixed scheduling problem
C Wolosewicz, S Dauzère-Pérès, R Aggoune
European Journal of Operational Research 75 (2), 413-426, 2012
72012
Performance Evaluation of Trust-Based Collaborative Sanctioning in MANETs
M Seredynski, R Aggoune, K Szczypiorski, D Khadraoui
2013 12th IEEE International Conference on Trust, Security and Privacy in …, 2013
52013
New integrated method to solve the problem of planning and scheduling
EDG Urrutia, R Aggoune, S Dauzère-Pérès
13th Congress of the French Society for Operational Research and Decision …, 2012
52012
Two-Job Shop Scheduling Problems with Availability Constraints.
R Aggoune
ICAPS, 253-259, 2004
52004
Regional waste heat valorisation: A mixed integer linear programming method for energy service companies
A Bertrand, A Mian, I Kantor, R Aggoune, F Maréchal
Energy 167, 454-468, 2019
42019
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20