Limao Zhang
Title
Cited by
Cited by
Year
Bayesian-network-based safety risk analysis in construction projects
L Zhang, X Wu, MJ Skibniewski, J Zhong, Y Lu
Reliability Engineering & System Safety 131, 29-39, 2014
1412014
Prospective safety performance evaluation on construction sites
X Wu, Q Liu, L Zhang, MJ Skibniewski, Y Wang
Accident Analysis & Prevention 78, 58-72, 2015
1122015
A dynamic Bayesian network based approach to safety decision support in tunnel construction
X Wu, H Liu, L Zhang, MJ Skibniewski, Q Deng, J Teng
Reliability Engineering & System Safety 134, 157-168, 2015
912015
Towards a Fuzzy Bayesian Network Based Approach for Safety Risk Analysis of Tunnel‐Induced Pipeline Damage
L Zhang, X Wu, Y Qin, MJ Skibniewski, W Liu
Risk Analysis 36 (2), 278-301, 2016
812016
A probabilistic approach for safety risk analysis in metro construction
L Zhang, MJ Skibniewski, X Wu, Y Chen, Q Deng
Safety science 63, 8-17, 2014
802014
Perceiving safety risk of buildings adjacent to tunneling excavation: An information fusion approach
L Zhang, X Wu, H Zhu, SM AbouRizk
Automation in Construction 73, 88-101, 2017
692017
Decision support analysis for safety control in complex project environments based on Bayesian Networks
L Zhang, X Wu, L Ding, MJ Skibniewski, Y Yan
Expert Systems with Applications 40 (11), 4273-4282, 2013
692013
A simulation-based decision model for designing contract period in building energy performance contracting
Q Deng, L Zhang, Q Cui, X Jiang
Building and Environment 71, 71-80, 2014
582014
A novel model for risk assessment of adjacent buildings in tunneling environments
L Zhang, X Wu, L Ding, MJ Skibniewski
Building and Environment 65, 185-194, 2013
512013
Safety management in tunnel construction: case study of Wuhan metro construction in China
L Ding, L Zhang, X Wu, MJ Skibniewski, Y Qunzhou
Safety science 62, 8-15, 2014
502014
Improved Fuzzy Bayesian Network-Based Risk Analysis With Interval-Valued Fuzzy Sets and DS Evidence Theory
Y Pan, L Zhang, ZW Li, L Ding
IEEE Transactions on Fuzzy Systems, 2019
492019
Strategic design of cost savings guarantee in energy performance contracting under uncertainty
Q Deng, X Jiang, Q Cui, L Zhang
Applied Energy 139, 68-80, 2015
492015
An improved Dempster–Shafer approach to construction safety risk perception
L Zhang, L Ding, X Wu, MJ Skibniewski
Knowledge-Based Systems 132, 30-46, 2017
482017
Bim-Based Risk Identification System in tunnel construction
L Zhang, X Wu, L Ding, MJ Skibniewski, Y Lu
Journal of Civil Engineering and Management 22 (4), 529-539, 2016
472016
A major infrastructure risk-assessment framework: Application to a cross-sea route project in China
T Wang, S Wang, L Zhang, Z Huang, Y Li
International Journal of Project Management 34 (7), 1403-1415, 2016
452016
Developing a cloud model based risk assessment methodology for tunnel-induced damage to existing pipelines
L Zhang, X Wu, Q Chen, MJ Skibniewski, J Zhong
Stochastic Environmental Research and Risk Assessment 29 (2), 513-526, 2015
422015
Simulation-based route planning for pedestrian evacuation in metro stations: a case study
L Zhang, M Liu, X Wu, SM AbouRizk
Automation in Construction 71, 430-442, 2016
382016
Perceiving interactions on construction safety behaviors: Workers’ perspective
L Zhang, Q Liu, X Wu, MJ Skibniewski
Journal of Management in Engineering 32 (5), 04016012, 2016
332016
BIM log mining: Discovering social networks
L Zhang, B Ashuri
Automation in Construction 91, 31-43, 2018
282018
Towards a safety management approach for adjacent buildings in tunneling environments: Case study in China
L Zhang, X Wu, Q Chen, MJ Skibniewski, SC Hsu
Building and Environment 75, 222-235, 2014
272014
The system can't perform the operation now. Try again later.
Articles 1–20