Segui
Kamil Erkan Kabak
Titolo
Citata da
Citata da
Anno
Strategies for employee job satisfaction: A case of service sector
KE Kabak, A Şen, K Göçer, S Küçüksöylemez, G Tuncer
Procedia-Social and Behavioral Sciences 150, 1167-1176, 2014
952014
Courageous leadership for the twenty-first century
A Şen, KE Kabak, G Yangınlar
Procedia-Social and Behavioral Sciences 75, 91-101, 2013
392013
Optimizing capacity allocation in semiconductor manufacturing photolithography area–Case study: Robert Bosch
A Ghasemi, R Azzouz, G Laipple, KE Kabak, C Heavey
Journal of Manufacturing Systems 54, 123-137, 2020
302020
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
KE Kabak, AM Ornek
Computers & Industrial Engineering 56 (2), 691-707, 2009
272009
Democratization of university management for quality higher education
A Şen, KE Kabak, F Tüysüz, D Kuzaliç
Procedia-Social and Behavioral Sciences 58, 1491-1504, 2012
212012
Impact of recipe restrictions on photolithography toolsets in an ASIC fabrication environment
KE Kabak, C Heavey, V Corbett, PJ Byrne
IEEE Transactions on Semiconductor Manufacturing 26 (1), 53-68, 2012
122012
An evaluation of SysML to support simulation modeling
P Liston, KE Kabak, P Dungan, J Byrne, P Young, C Heavey
Conceptual Modeling for Discrete-Event Simulation, 295-324, 2010
112010
Performance improvement for a wet bench tool
KE Kabak, C Heavey, V Corbett
Proceedings of the 2010 winter simulation conference, 2586-2593, 2010
72010
Implementing a new genetic algorithm to solve the capacity allocation problem in the photolithography area
A Ghasemi, C Heavey, KE Kabak
2018 Winter Simulation Conference (WSC), 3696-3707, 2018
62018
Flexibility as an enabler for carbon dioxide reduction in a global supply chain: a case study from the semiconductor industry
A Hamed, H Ehm, T Ponsignon, B Bayer, KE Kabak
2018 Winter Simulation Conference (WSC), 3408-3419, 2018
52018
Analysis of multiple process flows in an ASIC fab with a detailed photolithography area model
KE Kabak, C Heavey, V Corbett
2008 Winter Simulation Conference, 2185-2193, 2008
52008
Generating operating curves in complex systems using machine learning
B Can, C Heavey, KE Kabak
Proceedings of the Winter Simulation Conference 2014, 2404-2413, 2014
42014
An analysis of tool capabilities in the photolithography area of an ASIC fab
PJ Byrne, C Heavey, KE Kabak
2007 Winter Simulation Conference, 1761-1767, 2007
42007
A systematic literature review into simulation for building operations management theory: reaching beyond positivism?
KE Kabak, J Hinckeldeyn, R Dekkers
Journal of Simulation, 1-29, 2024
22024
Demonstration of the Feasibility of Real Time Application of Machine Learning to Production Scheduling
A Ghasemi, KE Kabak, C Heavey
2022 Winter Simulation Conference (WSC), 3406-3417, 2022
22022
Analyses of outcomes that used simulation modelling towards building theory
KE Kabak, J Hinkeldeyn, R Dekkers
Procedia manufacturing 39, 794-803, 2019
22019
Single toolset modeling approaches in semiconductor manufacturing
KE Kabak, C Heavey, B Kernan
Proceedings of the 2012 Winter Simulation Conference (WSC), 1-11, 2012
22012
Measurement of instability in multi-item MRP systems under varying operating conditions
KE Kabak, MA Ornek
sub to. Dokuz Eylül Üniversitesi, 2005
22005
Capacity modelling of a wet bench cluster tool with material handling robot
KE Kabak, C Heavey, V Corbett
International Journal of Computer Integrated Manufacturing 25 (11), 1029-1046, 2012
12012
Using AI Tools to Enhance the Risk Management Process in the Automotive Industry
D Dragomir, F Popișter, KE Kabak
International Scientific-Technical Conference MANUFACTURING, 189-198, 2024
2024
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20