Follow
Marco Giuntoli
Marco Giuntoli
Hitachi Energy
Verified email at hitachienergy.com
Title
Cited by
Cited by
Year
Optimized Thermal and Electrical Scheduling of a Large Scale Virtual Power Plant in the Presence of Energy Storages
M Giuntoli, D Poli
IEEE, 0
317
Control strategies and real time operation of storage systems integrated with MV photovoltaic plants
S Barsali, R Giglioli, M Giuntoli, G Lutzemberger, D Poli
2015 IEEE 15th International Conference on Environment and Electrical …, 2015
242015
A novel mixed-integer linear algorithm to generate Unit Commitment and dispatching scenarios for reliability test grids
D Poli, M Giuntoli
International Review of Electrical Engineering (IREE) 6 (4), 2011
22*2011
On the possible use of probabilistic techniques for purposes of short-term load dispatching
M Giuntoli, D Poli
International Review of Electrical Engineering 8 (4), 2013
192013
Mechanical behaviour of multi-span overhead transmission lines under dynamic thermal stress of conductors due to power flow and weather conditions
F Bassi, G Giannuzzi, M Giuntoli, P Pelacchi, D Poli
International Review on Modelling and Simulations 6 (4), 2013
192013
Thermo-mechanical dynamic rating of OHTL: applications to Italian lines
F Bassi, G Giannuzzi, M Giuntoli, P Pelacchi, D Poli
Proceedings CIGRE SESSION 2014, 2014
172014
On the use of simplified reactive power flow equations for purposes of fast reliability assessment
M Giuntoli, P Pelacchi, D Poli
Eurocon 2013, 992-997, 2013
172013
N-1-secure dispatch strategies of embedded HVDC using optimal power flow
N Meyer-Huebner, S Weck, F Bennewitz, M Suriyah, K Bhalodi, M Giuntoli, ...
2018 IEEE Power & Energy Society General Meeting (PESGM), 1-5, 2018
152018
Impact of a large fleet of EVs on the efficiency and reliability of an electric power system
R Giglioli, M Giuntoli, G Lutzemberger, D Poli
2014 IEEE International Electric Vehicle Conference (IEVC), 1-7, 2014
112014
Novel formulation of PTDF and LODF matrices for security constrained optimal power flow for hybrid AC and DC grids
M Giuntoli, V Biagini, K Schönleber
2019 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe), 1-5, 2019
102019
Control of distribution grids with storage using nested Benders’ decomposition
M Giuntoli, M Subasic, S Schmitt
Electric Power Systems Research 190, 106663, 2021
82021
Network operator owned storages as an option for congestion management
G Gutermuth, M Giuntoli
2020 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe), 1074-1078, 2020
62020
Placement of HVDC links for reduction of network congestions
M Giuntoli, S Schmitt, V Biagini, M Subasic, G Gutermuth, A Krontiris
2019 AEIT HVDC International Conference (AEIT HVDC), 1-6, 2019
62019
Parallel computing of sequential montecarlo techniques for reliable operation of smart grids
M Giuntoli, P Pelacchi, D Poli
IEEE EUROCON 2015-International Conference on Computer as a Tool (EUROCON), 1-6, 2015
62015
Experience on energy management in an industrial district
S Barsali, L Ferrari, S Magnani, D Poli, G Caridi, R Giglioli, M Pentolini, ...
22nd International Conference and Exhibition on Electricity Distribution …, 2013
62013
Fast solution of unit commitment using machine learning approaches
S Schmitt, I Harjunkoski, M Giuntoli, J Poland, X Feng
2022 IEEE 7th International Energy Conference (ENERGYCON), 1-6, 2022
52022
A novel HTLS thermo-mechanical model: applications to Italian OHTL
F Bassi, G Giannuzzi, M GIUNTOLI, G LUTZEMBERGER, P PELACCHI, ...
Set of papers, CIGRE session 44: 26th to 31st August 2012, 2016
42016
The PRIME project: the assessment of the impact of electric vehicles on the power system and on the environment
D POLI, MGS SCALARI, E PASCA, AQP MENGA, R BUCCIANTI, II ITALY
4*
Security analysis of embedded HVDC in transmission grids
M Giuntoli, S Schmitt
Advances in Energy System Optimization: Proceedings of the 2nd International …, 2020
32020
A novel procedure for the optimal scheduling of operating reserve based on stochastic optimization
D Poli, M Monaco, M Giuntoli, V Biagini
2019 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe), 1-5, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20