Early Cost Estimating of Road Tunnel Construction Using Neural Networks
K Petroutsatou, E Georgopoulos, S Lambropoulos, JP Pantouvakis
Journal of Construction Engineering and Management 1, 679-687, 2011
1382011
The use of time and cost utility for construction contract award under European Union Legislation
S Lambropoulos
Building and Environment 42 (1), 452-463, 2007
1112007
Fund allocation for transportation network recovery following natural disasters
MG Karlaftis, KL Kepaptsoglou, S Lambropoulos
Journal of Urban Planning and Development 133, 82-89, 2007
962007
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
A Kallantzis, S Lambropoulos
Engineering, Construction and Architectural Management 11 (3), 211-222, 2004
552004
Parametric Model for Conceptual Cost Estimation of Concrete Bridge Foundations
N Fragkakis, S Lambropoulos, G Tsiambaos
Journal of Infrastructure Systems 17 (2), 66-75, 2011
462011
Linear versus network scheduling: A critical path comparison
A Kallantzis, J Soldatos, S Lambropoulos
Journal of Construction Engineering and Management 133 (7), 483-491, 2007
452007
Road tunnel early cost estimates using multiple regression analysis
C Petroutsatou, S Lambropoulos, JP Pantouvakis
Operational Research 6, 311-322, 2006
442006
Preliminary cost estimate model for culverts
N Fragkakis, M Marinelli, S Lambropoulos
Procedia Engineering 123, 153-161, 2015
302015
A cost estimate method for bridge superstructures using regression analysis and bootstrap
N Fragkakis, S Lambropoulos, JP Pantouvakis
Organization, Technology and Management in Construction – An International …, 2010
302010
Objective Construction Contract Award using Cost, Time and Durability Utility
S Lambropoulos
Procedia – Social and Behavioral Sciences Journal 74, 487-497, 2013
252013
Rethinking new public infrastructure value for money in recession times: the Greek case
M Marinelli, K Petroutsatou, N Fragkakis, S Lambropoulos
International Journal of Construction Management 18 (4), 331-342, 2018
232018
SEMANTIC: Smart EarthMoving ANalysis and esTImation of Cost
S Lambropoulos, N Manolopoulos, JP Pantouvakis
Construction Management & Economics 14 (2), 79-92, 1996
231996
A simulation environment for construction project manager competence development in construction management
A Panas, JP Pantouvakis, S Lambropoulos
Procedia – Social and Behavioral Sciences Journal 119, 739-747, 2014
222014
Road tunnels construction cost estimation: a structural equation model development and comparison
K Petroutsatou, S Lambropoulos
Operational Research 10, 163-173, 2010
222010
Earthmoving Trucks Condition Level Prediction using Neural Networks
M Marinelli, S Lambropoulos, K Petroutsatou
Journal of Quality in Maintenance Engineering 20 (2), 182-192, 2014
212014
Modeling uncertainty during cost benefit analysis of transportation projects with the aid of fuzzy set theory
A Maravas, JP Pantouvakis, S Lambropoulos
Procedia-Social and Behavioral Sciences 48, 3661-3670, 2012
202012
Non-parametric bill-of-quantities estimation of concrete road bridges' superstructure: An artificial neural networks approach
Marinelli,M, Dimitriou,L, N Fragkakis, S Lambropoulos
Procs 31st Annual ARCOM Conference, 2015
182015
A quantity and cost estimate model for concrete road bridges
N Fragkakis, S Lambropoulos
Tech. Chron.Sci.J.TCG 24 (1-3), 141-154, 2004
152004
Reforming civil engineering studies in recession times
S Lambropoulos, JP Pantouvakis, M Marinelli
Procedia – Social and Behavioral Sciences Journal 119, 776-785, 2014
142014
Correspondence of activity relationships and critical path between time-location diagrams and CPM
A Kallantzis, S Lambropoulos
Operational Research 4, 277-290, 2004
142004
The system can't perform the operation now. Try again later.