Cid Carvalho de Souza
Cid Carvalho de Souza
Institute of Computing - University of Campinas, Brazil
Verified email at ic.unicamp.br - Homepage
Title
Cited by
Cited by
Year
The node capacitated graph partitioning problem: a computational study
CE Ferreira, A Martin, CC de Souza, R Weismantel, LA Wolsey
Mathematical programming 81 (2), 229-256, 1998
1321998
Efficient datapath merging for partially reconfigurable architectures
N Moreano, E Borin, C De Souza, G Araujo
IEEE Transactions on Computer-Aided Design of Integrated Circuits and …, 2005
1232005
Formulations and valid inequalities for the node capacitated graph partitioning problem
CE Ferreira, A Martin, CC de Souza, R Weismantel, LA Wolsey
Mathematical Programming 74 (3), 247-266, 1996
1021996
The edge-weighted clique problem: valid inequalities, facets and polyhedral computations
EM Macambira, CC De Souza
European Journal of Operational Research 123 (2), 346-371, 2000
742000
Hybrid column generation approaches for urban transit crew management problems
TH Yunes, AV Moura, CC De Souza
Transportation Science 39 (2), 273-288, 2005
722005
The vertex separator problem: a polyhedral investigation
E Balas, CC de Souza
Mathematical Programming 103 (3), 583-608, 2005
712005
Scheduling projects with labor constraints
C Cavalcante, C de Souza, M Savelsbergh, L Wolsey
Discrete Applied Mathematics 112 (1-3), 27-52, 2001
692001
The vertex separator problem: algorithms and computations
C de Souza, E Balas
Mathematical Programming 103 (3), 609-631, 2005
572005
Vehicle and crew scheduling for urban bus lines
MM Rodrigues, CC de Souza, AV Moura
European Journal of Operational Research 170 (3), 844-862, 2006
552006
An exact algorithm for minimizing vertex guards on art galleries
MC Couto, PJ de Rezende, CC de Souza
International Transactions in Operational Research 18 (4), 425-448, 2011
512011
Constructing nurse schedules at large hospitals
TM Dias, DF Ferber, CC De Souza, AV Moura
International Transactions in Operational Research 10 (3), 245-265, 2003
482003
A hybrid model for a multiproduct pipeline planning and scheduling problem
TMT Lopes, AA Ciré, CC de Souza, AV Moura
Constraints 15 (2), 151-189, 2010
452010
Optimal rectangular partitions
FC Calheiros, A Lucena, CC De Souza
Networks: An International Journal 41 (1), 51-67, 2003
402003
Planning and scheduling the operation of a very large oil pipeline network
AV Moura, CC de Souza, AA Cire, TMT Lopes
International Conference on Principles and Practice of Constraint …, 2008
392008
An exact and efficient algorithm for the orthogonal art gallery problem
MC Couto, CC De Souza, PJ De Rezende
XX Brazilian Symposium on Computer Graphics and Image Processing (SIBGRAPI …, 2007
372007
Solving very large crew scheduling problems to optimality
TH Yunes, AV Moura, CC De Souza
Proceedings of the 2000 ACM symposium on Applied computing-Volume 1, 446-451, 2000
342000
Multiprocessor scheduling under precedence constraints: Polyhedral results
PE Coll, CC Ribeiro, CC de Souza
Discrete Applied Mathematics 154 (5), 770-801, 2006
322006
A new approach to minimising the frontwidth in finite element calculations
CC de Souza, R Keunings, LA Wolsey, O Zone
Computer Methods in Applied Mechanics and Engineering 111 (3-4), 323-334, 1994
321994
A hybrid approach for solving large scale crew scheduling problems
TH Yunes, AV Moura, CC De Souza
International Symposium on Practical Aspects of Declarative Languages, 293-307, 2000
302000
A branch-and-cut-and-price approach for the capacitated m-ring–star problem
EA Hoshino, CC De Souza
Discrete Applied Mathematics 160 (18), 2728-2741, 2012
292012
The system can't perform the operation now. Try again later.
Articles 1–20