Follow
Nitin Lamba
Nitin Lamba
Unknown affiliation
Verified email at apache.org
Title
Cited by
Cited by
Year
Scheduling parallel production lines with resource constraints. 1. Model formulation
N Lamba, IA Karimi
Industrial & engineering chemistry research 41 (4), 779-789, 2002
622002
Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm
N Lamba, IA Karimi
Industrial & engineering chemistry research 41 (4), 790-800, 2002
402002
A nonlinear hybrid life support system: dynamic modeling, control design, and safety verification
S Glavaski, D Subramanian, K Ariyur, R Ghosh, N Lamba, ...
IEEE Transactions on Control Systems Technology 15 (6), 1003-1017, 2007
152007
Control design for a hybrid dynamic system: A NASA life support system
D Subramanian, K Ariyur, N Lamba, R Deshpande, S Glavaski
International Workshop on Hybrid Systems: Computation and Control, 570-584, 2004
72004
Scheduling a single-product reentrant process with uniform processing times
N Lamba, IA Karimi, A Bhalla
Industrial & engineering chemistry research 39 (11), 4203-4214, 2000
72000
A method for global optimization of large systems of quadratic constraints
N Lamba, M Dietz, DP Johnson, MS Boddy
Global Optimization and Constraint Satisfaction: Second International …, 2005
52005
Method for soft-computing supervision of dynamical processes with multiple control objectives
KOC Fregene, R Ghosh, N Lamba
US Patent 7,769,474, 2010
42010
A nonlinear model predictive control solution for a hybrid dynamic system: Nasa life support system
D Subramanian, N Lamba
Proceedings of the 2005, American Control Conference, 2005., 2781-2786, 2005
32005
Controller for a life support system
K Ariyur, R Ghosh, S Glavaski-Radovanovic, N Lamba, D Subramanian
US Patent App. 11/148,526, 2006
12006
NONLINEAR MODEL PREDICTIVE CONTROL SOLUTION FOR A HYBRID LIFE SUPPORT SYSTEM
D Subramanian, N Lamba
IFAC Proceedings Volumes 38 (1), 502-507, 2005
2005
Scheduling Studies in Resource Constrained Production Systems
N Lamba
National University of Singapore, 2000
2000
Short-term Scheduling of Multi-product Parallel Lines with Resource Constraints ASRC# 290602, 290699
N Lamba, IA Karimi
Chemeca 2000 (28th: 2000: Perth, WA), 350-355, 2000
2000
The system can't perform the operation now. Try again later.
Articles 1–12