Carlo Meloni
TitleCited byYear
A signal timing plan formulation for urban traffic control
M Dotoli, MP Fanti, C Meloni
Control engineering practice 14 (11), 1297-1311, 2006
1322006
Design and optimization of integrated e-supply chain for agile and environmentally conscious manufacturing
M Dotoli, MP Fanti, C Meloni, MC Zhou
IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and …, 2006
1092006
Robust optimization in simulation: Taguchi and response surface methodology
G Dellino, JPC Kleijnen, C Meloni
International Journal of Production Economics 125 (1), 52-59, 2010
1052010
A multi-level approach for network design of integrated supply chains
M Dotoli, MP Fanti*, C Meloni, MC Zhou
International journal of production research 43 (20), 4267-4287, 2005
822005
Robust optimization in simulation: Taguchi and Krige combined
G Dellino, JPC Kleijnen, C Meloni
INFORMS Journal on Computing 24 (3), 471-484, 2012
792012
A rollout metaheuristic for job shop scheduling problems
C Meloni, D Pacciarelli, M Pranzo
Annals of Operations Research 131 (1-4), 215-235, 2004
602004
Set-up coordination between two stages of a supply chain
A Agnetis, P Detti, C Meloni, D Pacciarelli
Annals of Operations Research 107 (1-4), 15-32, 2001
482001
Kriging metamodel management in the design optimization of a CNG injection system
G Dellino, P Lino, C Meloni, A Rizzo
Mathematics and Computers in Simulation 79 (8), 2345-2360, 2009
452009
Robust simulation-optimization using metamodels
G Dellino, JPC Kleijnen, C Meloni
Simulation Conference (WSC), Proceedings of the 2009 Winter, 540-550, 2009
442009
Long term evaluation of operating theater planning policies
A Agnetis, A Coppi, M Corsini, G Dellino, C Meloni, M Pranzo
Operations Research for Health Care 1 (4), 95-104, 2012
392012
A decomposition approach for the combined master surgical schedule and surgical case assignment problems
A Agnetis, A Coppi, M Corsini, G Dellino, C Meloni, M Pranzo
Health care management science 17 (1), 49-59, 2014
302014
Autonomous agents architectures and algorithms in flexible manufacturing systems
L Adacher, A Agnetis, C Meloni
Iie Transactions 32 (10), 941-951, 2000
272000
A tabu search algorithm for scheduling pharmaceutical packaging operations
L Venditti, D Pacciarelli, C Meloni
European Journal of Operational Research 202 (2), 538-546, 2010
242010
Multi-objective evolutionary algorithms for a class of sequencing problems in manufacturing environments
C Meloni, D Naso, B Turchiano
Systems, Man and Cybernetics, 2003. IEEE International Conference on 1, 8-13, 2003
222003
A new class of greedy heuristics for job shop scheduling problems
M Pranzo, C Meloni, D Pacciarelli
International Workshop on Experimental and Efficient Algorithms, 223-236, 2003
222003
A multi-criteria decision support methodology for real-time train scheduling
M Samà, C Meloni, A D'Ariano, F Corman
Journal of Rail Transport Planning & Management 5 (3), 146-162, 2015
212015
Minimizing and balancing setups in a serial production system
P Detti, C Meloni, M Pranzo
International Journal of Production Research 45 (24), 5769-5788, 2007
192007
Real time optimization of traffic signal control: application to coordinated intersections
M Dotoli, MP Fanti, C Meloni
Systems, Man and Cybernetics, 2003. IEEE International Conference on 4, 3288 …, 2003
192003
A linear algorithm for the Hamiltonian completion number of the line graph of a tree
A Agnetis, P Detti, C Meloni, D Pacciarelli
Information Processing Letters 79 (1), 17-24, 2001
192001
Energy Production Forecasting in a PV plant using Transfer Function Models
G Dellino, T Laudadio, R Mari, N Mastronardi, C Meloni, S Vergura
Proceedings of the15th IEEE International Conference on Environment and …, 2015
172015
The system can't perform the operation now. Try again later.
Articles 1–20