Integer programming methods for large-scale practical classroom assignment problems AE Phillips, H Waterer, M Ehrgott, DM Ryan Computers & Operations Research 53, 42-53, 2015 | 102 | 2015 |
Solving shortest path problems with a weight constraint and replenishment arcs OJ Smith, N Boland, H Waterer Computers & Operations Research 39 (5), 964-984, 2012 | 96 | 2012 |
Hydro-electric unit commitment subject to uncertain demand AB Philpott, M Craddock, H Waterer European Journal of Operational Research 125 (2), 410-424, 2000 | 94 | 2000 |
Comparison of mixed-integer programming and genetic algorithm methods for distributed generation planning JD Foster, AM Berry, N Boland, H Waterer IEEE transactions on power systems 29 (2), 833-843, 2013 | 90 | 2013 |
Wind turbine interference in a wind farm layout optimization mixed integer linear programming model R Archer, G Nates, S Donovan, H Waterer Wind Engineering 35 (2), 165-175, 2011 | 82 | 2011 |
Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain N Boland, T Kalinowski, H Waterer, L Zheng Journal of Scheduling 16, 649-659, 2013 | 55 | 2013 |
Geometric optimization of a thermoacoustic regenerator F Zink, H Waterer, R Archer, L Schaefer International Journal of Thermal Sciences 48 (12), 2309-2322, 2009 | 52 | 2009 |
Scheduling arc maintenance jobs in a network to maximize total flow over time N Boland, T Kalinowski, H Waterer, L Zheng Discrete Applied Mathematics 163, 34-52, 2014 | 51 | 2014 |
Resource considerations for integrated planning of railway traffic and maintenance windows T Lidén, T Kalinowski, H Waterer Journal of rail transport planning & management 8 (1), 1-15, 2018 | 43 | 2018 |
The relation of time indexed formulations of single machine scheduling problems to the node packing problem H Waterer, EL Johnson, P Nobili, MWP Savelsbergh Mathematical Programming 93, 477-494, 2002 | 30 | 2002 |
Mixed integer programming models for wind farm design S Donovan, G Nates, H Waterer, R Archer MIP 2008 Workshop on Mixed Integer Programming, Columbia University, New …, 2008 | 26 | 2008 |
A bucket indexed formulation for nonpreemptive single machine scheduling problems N Boland, R Clement, H Waterer INFORMS Journal on Computing 28 (1), 14-30, 2016 | 23 | 2016 |
Extended formulations for convex hulls of some bilinear functions A Gupte, T Kalinowski, F Rigterink, H Waterer Discrete Optimization 36, 100569, 2020 | 22 | 2020 |
Scheduling of maintenance windows in a mining supply chain rail network T Kalinowski, J Matthews, H Waterer Computers & Operations Research 115, 104670, 2020 | 18 | 2020 |
Airline planning benchmark problems—Part II: Passenger groups, utility and demand allocation K Akartunalı, N Boland, I Evans, M Wallace, H Waterer Computers & operations research 40 (3), 793-804, 2013 | 17 | 2013 |
Airline planning benchmark problems—Part I:: Characterising networks and demand using limited data K Akartunalı, N Boland, I Evans, M Wallace, H Waterer Computers & operations research 40 (3), 775-792, 2013 | 16 | 2013 |
Possession assessment and capacity evaluation of the Central Queensland Coal Network M Savelsbergh, H Waterer, M Dall, C Moffiet EURO Journal on Transportation and Logistics 4, 139-173, 2015 | 11 | 2015 |
A zero-one integer programming model for room assignment at the University of Auckland H Waterer Proceedings of the 1995 ORSNZ Conference, 63-69, 1995 | 11 | 1995 |
An optimisation approach to maintenance scheduling for capacity alignment in the Hunter Valley coal chain N Boland, T Kalinowski, H Waterer, L Zheng Proceedings of the 35th APCOM Symposium: Applications of Computers and …, 2011 | 8 | 2011 |
Shipping data generation for the hunter valley coal chain N Boland, M Savelsbergh, H Waterer Optimization Online e-Print ID, 02-3755, 2013 | 7 | 2013 |