Volgen
Ernie Kee
Ernie Kee
Research Associate, Nuclear Plasma & Rad. Engr., SoTeRiA-IAP
Geverifieerd e-mailadres voor illinois.edu - Homepage
Titel
Geciteerd door
Geciteerd door
Jaar
Prioritizing project selection
A Koc, DP Morton, E Popova, SM Hess, E Kee, D Richards
The Engineering Economist 54 (4), 267-297, 2009
492009
Simulation-informed probabilistic methodology for common cause failure analysis
T Sakurahara, G Schumock, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 84-99, 2019
482019
An integrated methodology for spatio-temporal incorporation of underlying failure mechanisms into fire probabilistic risk assessment of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee, M Brandyberry, ...
Reliability Engineering & System Safety 169, 242-257, 2018
412018
Data-theoretic methodology and computational platform to quantify organizational factors in socio-technical risk analysis
J Pence, T Sakurahara, X Zhu, Z Mohaghegh, M Ertem, C Ostroff, E Kee
Reliability Engineering & System Safety 185, 240-260, 2019
362019
Risk-informed resolution of generic safety issue 191
Z Mohaghegh, E Kee, SA Reihani, R Kazemi, D Johnson, R Grantom, ...
International Topical Meeting on Probabilistic Safety Assessment and …, 2013
362013
Global importance measure methodology for integrated probabilistic risk assessment
T Sakurahara, S Reihani, E Kee, Z Mohaghegh
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2020
292020
Basic factors to forecast maintenance cost and failure processes for nuclear power plants
E Popova, W Yu, E Kee, A Sun, D Richards, R Grantom
Nuclear Engineering and Design 236 (14-16), 1641-1647, 2006
282006
Corrosion and solubility in a TSP-buffered chemical environment following a loss of coolant accident: Part 1–Aluminum
KJ Howe, L Mitchell, SJ Kim, ED Blandford, EJ Kee
Nuclear Engineering and Design 292, 296-305, 2015
262015
Quantifying organizational factors in human reliability analysis using the big data-theoretic algorithm
J Pence, Z Mohaghegh, V Dang, C Ostroff, E Kee, R Hubenak, MA Billings
International Topical Meeting on Probabilistic Safety Assessment and …, 2015
242015
Toward monitoring organizational safety indicators by integrating probabilistic risk assessment, socio-technical systems theory, and big data analytics
J Pence, Z Mohaghegh, E Kee, F Yilmaz, R Grantom, D Johnson
Proceedings of 12th international topical meeting on probabilistic safety …, 2014
242014
Application of Crow-AMSAA analysis to nuclear power plant equipment performance
A Sun, E Kee, W Yu, E Popova, R Grantom, D Richards
13th International Conference on Nuclear Engineering, 1-6, 2005
242005
An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants
H Bui, T Sakurahara, J Pence, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 405-428, 2019
222019
Methodology to evaluate the monetary benefit of Probabilistic Risk Assessment by modeling the net value of Risk-Informed Applications at nuclear power plants
J Pence, M Abolhelm, Z Mohaghegh, S Reihani, M Ertem, E Kee
Reliability Engineering & System Safety 175, 171-182, 2018
192018
Methodological and practical comparison of integrated probabilistic risk assessment (I-PRA) with the existing fire PRA of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee
Nuclear technology 204 (3), 354-377, 2018
182018
Integrated PRA methodology to advance fire risk modeling for nuclear power plants
T Sakurahara, SA Reihani, Z Mohaghegh, M Brandyberry, E Kee, ...
25th European Safety and Reliability Conference, ESREL 2015, 595-603, 2015
162015
RoverD: use of test data in GSI-191 risk assessment
E Kee, J Hasenbein, A Zolan, P Grissom, S Reihani, Z Mohaghegh, ...
Nuclear technology 196 (2), 270-291, 2016
152016
A new integrated framework to advance fire probabilistic risk analysis of nuclear power plants
T Sakurahara, Z Mohaghegh, E Kee, S Rodgers, M Brandyberry, ...
Transactions of the American Nuclear Society 109 (PART 2), 2056-2060, 2013
152013
Integrating renewal process modeling with Probabilistic Physics-of-Failure: Application to Loss of Coolant Accident (LOCA) frequency estimations in nuclear power plants
T Sakurahara, N O'Shea, WC Cheng, S Zhang, S Reihani, E Kee, ...
Reliability Engineering & System Safety 190, 106479, 2019
142019
GIS‐based integration of social vulnerability and level 3 probabilistic risk assessment to advance emergency preparedness, planning, and response for severe nuclear power plant …
J Pence, I Miller, T Sakurahara, J Whitacre, S Reihani, E Kee, ...
Risk analysis 39 (6), 1262-1280, 2019
142019
Experimental observations of boric acid precipitation scenarios
R Vaghetto, M Childs, P Jones, S Lee, E Kee, YA Hassan
Nuclear Engineering and Design 312, 422-428, 2017
142017
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20