Single item lot sizing problems N Brahimi, S Dauzere-Peres, NM Najid, A Nordli European Journal of Operational Research 168 (1), 1-16, 2006 | 520 | 2006 |
Integrated production planning and preventive maintenance in deteriorating production systems EH Aghezzaf, NM Najid Information Sciences 178 (17), 3382-3392, 2008 | 165 | 2008 |
Models for robust tactical planning in multi-stage production systems with uncertain demands EH Aghezzaf, C Sitompul, NM Najid Computers & Operations Research 37 (5), 880-889, 2010 | 120 | 2010 |
An integrated production and maintenance planning model with time windows and shortage cost NM Najid, M Alaoui-Selsouli, A Mohafid International journal of production research 49 (8), 2265-2283, 2011 | 118 | 2011 |
A modified simulated annealing method for flexible job shop scheduling problem NM Najid, S Dauzere-Peres, A Zaidat IEEE international conference on systems, man and cybernetics 5, 6 pp. vol. 5, 2002 | 93 | 2002 |
Capacitated multi-item lot-sizing problems with time windows N Brahimi, S Dauzère-Pérès, NM Najid Operations Research 54 (5), 951-967, 2006 | 85 | 2006 |
Modularity in the design of reconfigurable manufacturing systems K Lameche, NM Najid, P Castagna, K Kouiss IFAC-PapersOnLine 50 (1), 3511-3516, 2017 | 51 | 2017 |
Lagrangian relaxation based heuristic for an integrated production and maintenance planning problem M Alaoui-Selsouli, A Mohafid, NM Najid International Journal of Production Research 50 (13), 3630-3642, 2012 | 24 | 2012 |
A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor Y Kadrou, NM Najid The Proceedings of the Multiconference on" Computational Engineering in …, 2006 | 24 | 2006 |
The single-item lot sizing problem with time windows S Dauzère-Pérès, N Brahimi, N Najid, A Nordli Rapport de Recherche, 2002 | 23 | 2002 |
Integrated production and preventive maintenance in production systems subject to random failures EH Aghezzaf, C Sitompul, N Najid Actes de Mosim'08, 1-8, 2008 | 20 | 2008 |
Uncapacitated lot-sizing problems with time windows S Dauzere-Péres, N Brahimi, NM Najid, A Nordli École des Mines de Nantes Research Report, 2002 | 14 | 2002 |
An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility NM Najid, M Arroub International Journal of Mathematics in Operational Research 2 (6), 748-761, 2010 | 13 | 2010 |
Tabu search algorithm for the MRCPSP with multi-skilled personnel Y Kadrou, NM Najid Computational Engineering in System Application, IMACS Multi Conference 2 (4 …, 2006 | 10 | 2006 |
Agent based approach for a real-time shop floor control NM Najid, K Kouiss, O Derriche IEEE International Conference on Systems, Man and Cybernetics 4, 6 pp. vol. 4, 2002 | 10 | 2002 |
Utilisation de l'approche multi-agents pour le pilotage en temps réel des systèmes de production Y HAFRI, NM NAJID Conception, analyse et gestion des sytèmes industriels (Troyes, 25-27 avril …, 2001 | 10 | 2001 |
System engineering-based methodology to design reconfigurable manufacturing systems NM Najid, P Castagna, K Kouiss Reconfigurable Manufacturing Systems: From Design to Implementation, 29-55, 2020 | 9 | 2020 |
Un couplage MES-simulation pour le pilotage d'un système de production K Kouiss, NM Najid 5e Conférence Francophone de MOdélisation et SIMulation" Modélisation et …, 2004 | 8 | 2004 |
The storage space allocation problem in a dry bulk terminal: a heuristic solution AA Ouhaman, K Benjelloun, JP Kenné, N Najid IFAC-PapersOnLine 53 (2), 10822-10827, 2020 | 6 | 2020 |
On the integrated production, inventory and preventive maintenance problem in manufacturing systems with backorder JP Kenne, A Gharbi, NM Najid International Journal of Simulation and Process Modelling 5 (4), 300-312, 2009 | 6 | 2009 |