Segui
Marcos Silvoso
Marcos Silvoso
Professor PROARQ-FAU/UFRJ
Email verificata su fau.ufrj.br - Home page
Titolo
Citata da
Citata da
Anno
Cement replacement by sugar cane bagasse ash: CO2 emissions reduction and potential for carbon credits
EMR Fairbairn, BB Americano, GC Cordeiro, TP Paula, RD Toledo Filho, ...
Journal of environmental management 91 (9), 1864-1871, 2010
2892010
Optimization of mass concrete construction using genetic algorithms
EMR Fairbairn, MM Silvoso, RD Toledo Filho, JLD Alves, NFF Ebecken
Computers & structures 82 (2-3), 281-299, 2004
1232004
Modelling the structural behaviour of a dam affected by alkali–silica reaction
EMR Fairbairn, FLB Ribeiro, LE Lopes, RD Toledo‐Filho, MM Silvoso
Communications in Numerical Methods in Engineering 22 (1), 1-12, 2006
572006
Modeling adiabatic temperature rise during concrete hydration: A data mining approach
AG Evsukoff, EMR Fairbairn, EF Faria, MM Silvoso, RD Toledo Filho
Computers & structures 84 (31-32), 2351-2362, 2006
362006
Numerical simulation of dam construction using low-CO2-emission concrete
EMR Fairbairn, IA Ferreira, GC Cordeiro, MM Silvoso, RD Toledo Filho, ...
Materials and structures 43, 1061-1074, 2010
272010
Smeared cracking FEM simulation of alkali silica expansion using a new macroscopic coupled model
EMR Fairbairn, FL Riberio, RD Toledo-Filho, LE Lopes, MM Silvoso, ...
Proceeding of the 12th International conference on Alkaliaggregate reaction …, 2004
132004
Otimização da fase construtiva de estruturas de concreto em face dos efeitos da hidratação via algoritmos genéticos
MM Silvoso
Universidade Federal do Rio de Janeiro, 2003
132003
Impact of fourth industrial revolution in architecture undergraduate course
BMF Leal, MS Salgado, MM Silvoso
ZEMCH 2018 International Conference, Melbourne, Australia, 29th January–1st …, 2018
122018
Determining the adiabatic temperature rise of concrete by inverse analysis: case study of a spillway gate pier
EMR Fairbairn, MM Silvoso, FLB Ribeiro, RD Toledo-Filho
European Journal of Environmental and Civil Engineering 21 (3), 272-288, 2017
122017
Basic creep of steel fibers reinforced composites
RV Velasco, RD Toledo Filho, EMR Fairbairn, MM Silvoso
Proc. of the 8th International Conference on Creep, Shrinkage and Durability …, 2008
102008
Thermo-Chemo-Mechanical Cracking Assessment for Early-Age Mass Concrete Structures.
EMR Fairbairn, MM Silvoso, EAB Koenders, FLB Ribeiro
Concrete international 34 (5), 2012
92012
Multi-objective optimization of the geometry of single-family housing to improve thermal performance
AS Berleze, ABH Brasileiro, MM Silvoso
Ambiente Construído 21, 41-65, 2021
72021
Study of the technical capability of sugarcane bagasse ash in concrete production
T da Cruz Sessa, MM Silvoso, E Vazquez, EL Qualharini, AN Haddad, ...
Materials Science Forum 866, 53-57, 2016
72016
Estudo das propriedades mecânicas e da aderência do sistema argamassa de reparo com cimento geopolimérico/substrato de concreto com cimento Portland
SC Mazza
MEAU, UFBA, 2010
62010
Structures
EM Fairbairn, MM Silvoso, RD Toledo Filho, JL Alves, N Ebecken
Optimization of Mass Concrete Construction Using Genetic Algorithms 82 (2-3 …, 2004
62004
Industrial applications of the thermo-chemo-mechanical model
EMR FAIRBAIRN, MM SILVOSO, FLB RIBEIRO, RD TOLEDO-FILHO
Actes des journées scientifiques du LCPC, 353-370, 2011
52011
Manual de utilização do programa MEC-COPPE 1.0–Simulador de compacidade de misturas granulares secas através do Método de Empacotamento Compressível (MEC)
MM Silvoso
Rio de Janeiro, Brasil, 2008
52008
A new comprehensive framework for the analysis of mass concrete: thermo-chemo-mechanical, experimental, numerical and data modeling
EMR Fairbairn, RD Toledo Filho, MM Silvoso, FLB Ribeiro, AG Evsukoff, ...
22nd ICOLD congress—international symposium on dams in the societies of the …, 2006
52006
Modelagem numérica do concreto a poucas idades
MM Silvoso
UNIVERSIDADE FEDERAL DO RIO DE JANEIRO, 2002
52002
Avaliação pós-construção de obras públicas: contratação em etapas de execução
V Yamauchi, MM Silvoso, RS Wiese
Gestão & Planejamento-G&P 21, 2020
42020
Il sistema al momento non può eseguire l'operazione. Riprova più tardi.
Articoli 1–20