Estimating transition probabilities in Markov chain-based deterioration models for management of wastewater systems HS Baik, HS Jeong, DM Abraham Journal of water resources planning and management 132 (1), 15-24, 2006 | 282 | 2006 |
BIM acceptance model in construction organizations S Lee, J Yu, D Jeong Journal of management in engineering 31 (3), 04014048, 2015 | 161 | 2015 |
Allocating security resources to a water supply network J Qiao, D Jeong, M Lawley, JPP Richard, DM Abraham, Y Yih IIE Transactions 39 (1), 95-109, 2007 | 83 | 2007 |
Linear scheduling model with varying production rates GA Duffy, GD Oberlender, DH Seok Jeong Journal of Construction Engineering and Management 137 (8), 574-582, 2011 | 50 | 2011 |
Evaluation of an emerging market in subsurface utility engineering HS Jeong, DM Abraham, JJ Lew Journal of construction engineering and management 130 (2), 225-234, 2004 | 41 | 2004 |
Asset management assessment model for state departments of transportation SR Cooksey, DHS Jeong, MJ Chae Journal of Management in Engineering 27 (3), 159-169, 2011 | 38 | 2011 |
Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation H Kim, S Bang, H Jeong, Y Ham, H Kim Automation in Construction 92, 188-198, 2018 | 37 | 2018 |
A risk management approach to safety assessment of trenchless technologies for culvert rehabilitation S Syachrani, HSD Jeong, V Rai, MJ Chae, T Iseley Tunnelling and Underground Space Technology 25 (6), 681-688, 2010 | 37 | 2010 |
Decision tree–based deterioration model for buried wastewater pipelines S Syachrani, HSD Jeong, CS Chung Journal of performance of constructed facilities 27 (5), 633-645, 2013 | 35 | 2013 |
Analysis of cost-estimating competencies using criticality matrix and factor analysis A Alroomi, DHS Jeong, GD Oberlender Journal of Construction Engineering and Management 138 (11), 1270-1280, 2012 | 32 | 2012 |
Framework for integrating and assessing highway infrastructure data A Woldesenbet, HD Jeong, H Park Journal of Management in Engineering 32 (1), 04015028, 2016 | 31 | 2016 |
Minimizing the consequences of intentional attack on water infrastructure HS Jeong, J Qiao, DM Abraham, M Lawley, JP Richard, Y Yih Computer‐Aided Civil and Infrastructure Engineering 21 (2), 79-92, 2006 | 31 | 2006 |
Applying process simulation technique to value engineering model: A case study of hospital building project BY Chung, S Syachrani, HS Jeong, YH Kwak IEEE transactions on engineering management 56 (3), 549-559, 2009 | 24 | 2009 |
Applying process simulation technique to value engineering model: A case study of hospital building project BY Chung, S Syachrani, HS Jeong, YH Kwak IEEE transactions on engineering management 56 (3), 549-559, 2009 | 24 | 2009 |
A decision tool for the selection of imaging technologies to detect underground infrastructure HS Jeong, DM Abraham Tunnelling and underground space technology 19 (2), 175-191, 2004 | 24 | 2004 |
Interlinking life-cycle data spaces to support decision making in highway asset management T Le, HD Jeong Automation in Construction 64, 54-64, 2016 | 23 | 2016 |
Operational response model for physically attacked water networks using NSGA-II H Seok Jeong, DM Abraham Journal of computing in civil engineering 20 (5), 328-338, 2006 | 21 | 2006 |
Reducing data-collection efforts for conceptual cost estimating at a highway agency BJ Gardner, DD Gransberg, HD Jeong Journal of Construction Engineering and Management 142 (11), 04016057, 2016 | 19 | 2016 |
Civil integrated management: An emerging paradigm for civil infrastructure project delivery and management F Guo, CT Jahren, Y Turkan, H David Jeong Journal of Management in Engineering 33 (2), 04016044, 2017 | 18 | 2017 |
Prediction of flexible pavement deterioration in relation to climate change using fuzzy logic H Jeong, H Kim, K Kim, H Kim Journal of Infrastructure Systems 23 (4), 04017008, 2017 | 17 | 2017 |