Follow
Kondo Hloindo Adjallah
Title
Cited by
Cited by
Year
Reliability allocation through cost minimization
AOC Elegbede, C Chu, KH Adjallah, F Yalaoui
IEEE Transactions on reliability 52 (1), 106-111, 2003
2402003
Availability allocation to repairable systems with genetic algorithms: a multi-objective formulation
C Elegbede, K Adjallah
Reliability Engineering & System Safety 82 (3), 319-330, 2003
1742003
Non-linear observer-based fault detection
Adjallah, Maquin, Ragot
1994 Proceedings of IEEE International Conference on Control and …, 1994
771994
Wind turbine power output prediction model design based on artificial neural networks and climatic spatiotemporal data
B Bilal, M Ndongo, KH Adjallah, A Sava, CMF Kébé, PA Ndiaye, ...
2018 IEEE International Conference on Industrial Technology (ICIT), 1085-1092, 2018
482018
Earliness–tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods
M Rebai, I Kacem, KH Adjallah
Journal of Intelligent Manufacturing 23, 1207-1224, 2012
422012
On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
KP Adzakpa, KH Adjallah, F Yalaoui
Journal of intelligent manufacturing 15 (2), 131-140, 2004
312004
A comparison between SVM and PLS for E-nose based gas concentration monitoring
R Laref, E Losson, A Sava, K Adjallah, M Siadat
2018 IEEE international conference on industrial technology (ICIT), 1335-1339, 2018
272018
Scheduling jobs and maintenance activities on parallel machines
M Rebai, I Kacem, KH Adjallah
Operational Research 13, 363-383, 2013
272013
Determination of wind potential characteristics and techno-economic feasibility analysis of wind turbines for Northwest Africa
B Bilal, KH Adjallah, K Yetilmezsoy, M Bahramian, E Kıyan
Energy 218, 119558, 2021
232021
Contribution au diagnostic des systèmes par observateur d'état
KH Adjallah
Institut National Polytechnique de Lorraine, 1993
211993
NDSC based methods for maximizing the lifespan of randomly deployed wireless sensor networks for infrastructures monitoring
YEE Ahmed, KH Adjallah, R Stock, I Kacem, SF Babiker
Computers & Industrial Engineering 115, 17-25, 2018
202018
PWM energy converters: fractal method of dynamics forecasting in practical application
YV Kolokolov, AV Monovskaya, KH Adjallah
IEEE Transactions on Energy Conversion 24 (2), 483-492, 2009
182009
Hybrid Petri nets for modeling and control of multi-source energy conversion systems
A Sava, KH Adjallah, H Lagaza
2014 International Conference on Control, Decision and Information …, 2014
172014
MaxEnt feature-based reliability model method for real-time detection of early chatter in high-speed milling
Y Zhao, KH Adjallah, A Sava, Z Wang
ISA transactions 113, 39-51, 2021
162021
Kernel estimator of maintenance optimization model for a stochastically degrading system under different operating environments
IB Sidibé, A Khatab, C Diallo, KH Adjallah
Reliability Engineering & System Safety 147, 109-116, 2016
152016
A new effective heuristic for the intelligent management of the preventive maintenance tasks of the distributed systems
KP Adzakpa, KH Adjallah, J Lee
Advanced Engineering Informatics 17 (3-4), 151-163, 2003
142003
A systematic approach to matrix forms of the Pascal triangle: The twelve triangular matrix forms and relations
B Birregah, PK Doh, KH Adjallah
European Journal of Combinatorics 31 (5), 1205-1216, 2010
132010
Wind power conversion system model identification using adaptive neuro-fuzzy inference systems: A case study
B Bilal, KH Adjallah, A Sava, K Yetilmezsoy, E Kıyan
Energy 239, 122089, 2022
102022
Fuzzy model identification based on mixture distribution analysis for bearings remaining useful life estimation using small training data set
F Huang, A Sava, KH Adjallah, Z Wang
Mechanical Systems and Signal Processing 148, 107173, 2021
102021
Wireless sensor network lifespan optimization with simple, rotated, order and modified partially matched crossover genetic algorithms
YEE Ahmed, KH Adjallah, R Stock, SF Babikier
IFAC-PapersOnLine 49 (25), 182-187, 2016
102016
The system can't perform the operation now. Try again later.
Articles 1–20