Application of reinforcement learning for agent-based production scheduling YC Wang, JM Usher Engineering applications of artificial intelligence 18 (1), 73-82, 2005 | 302 | 2005 |
Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM–FBPN-ensemble approach with multiple buckets and partial normalization T Chen, YC Wang, HR Tsai The International Journal of Advanced Manufacturing Technology 42, 1206-1216, 2009 | 81 | 2009 |
Incorporating the FCM–BPN approach with nonlinear programming for internal due date assignment in a wafer fabrication plant T Chen, YC Wang Robotics and Computer-Integrated Manufacturing 26 (1), 83-91, 2010 | 66 | 2010 |
A note on ‘optimization of multi-pass turning operations using ant colony system’ YC Wang International Journal of Machine Tools and Manufacture 47 (12-13), 2057-2059, 2007 | 62 | 2007 |
Learning policies for single machine job dispatching YC Wang, JM Usher Robotics and Computer-Integrated Manufacturing 20 (6), 553-562, 2004 | 55 | 2004 |
An agent-based fuzzy collaborative intelligence approach for precise and accurate semiconductor yield forecasting T Chen, YC Wang IEEE Transactions on Fuzzy Systems 22 (1), 201-211, 2013 | 50 | 2013 |
Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics IL Wang, YC Wang, CW Chen Flexible Services and Manufacturing Journal 25, 343-366, 2013 | 44 | 2013 |
Evaluating flexibility on order quantity and delivery lead time for a supply chain system YC Wang International Journal of Systems Science 39 (12), 1193-1202, 2008 | 44 | 2008 |
A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory—a simulation study T Chen, YC Wang The International Journal of Advanced Manufacturing Technology 45, 110-121, 2009 | 41 | 2009 |
A fuzzy-neural approach for remaining cycle time estimation in a semiconductor manufacturing factory—a simulation study T Chen, YC Wang, HC Wu International Journal of Innovative Computing, Information and Control 5 (8 …, 2009 | 40 | 2009 |
Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab T Chen, HC Wu, YC Wang Applied Soft Computing 9 (4), 1225-1231, 2009 | 39 | 2009 |
A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant T Chen, A Jeang, YC Wang The International Journal of Advanced Manufacturing Technology 36, 570-581, 2008 | 39 | 2008 |
A reinforcement learning approach for developing routing policies in multi-agent production scheduling YC Wang, JM Usher The International Journal of Advanced Manufacturing Technology 33, 323-333, 2007 | 36 | 2007 |
A fuzzy-neural approach for global CO2 concentration forecasting T Chen, YC Wang Intelligent Data Analysis 15 (5), 763-777, 2011 | 31 | 2011 |
A simulation analysis of part launching and order collection decisions for a flexible manufacturing system YC Wang, T Chen, H Chiang, HC Pan Simulation Modelling Practice and Theory 69, 80-91, 2016 | 29 | 2016 |
An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory T Chen, YC Wang Mathematical Problems in Engineering 2013, 2013 | 28 | 2013 |
A bi-criteria nonlinear fluctuation smoothing rule incorporating the SOM–FBPN remaining cycle time estimator for scheduling a wafer fab—a simulation study T Chen, YC Wang The International Journal of Advanced Manufacturing Technology 49, 709-721, 2010 | 25 | 2010 |
A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory T Chen, YC Wang Fuzzy Sets and Systems 160 (5), 569-585, 2009 | 25 | 2009 |
A bi-criteria four-factor fluctuation smoothing rule for scheduling jobs in a wafer fabrication factory TC Chen, YC Wang, YC Lin International Journal of Innovative Computing, Information and Control 6 (10 …, 2010 | 23 | 2010 |
A sensitivity analysis of solving joint replenishment problems using the RAND method under inaccurate holding cost estimates and demand forecasts YC Wang, WT Cheng Computers & Industrial Engineering 55 (1), 243-252, 2008 | 22 | 2008 |